795 Geary Street
Tenderloin · San Francisco, CA 94109
Permit history
-
Oct 1982
Additions alterations or repairs.
-
Oct 1984
Reinforce parapet.
-
Jul 1985
Parapet reinforceing.
-
Oct 1998
Bolts-plus, floor & roof anchors at each level.
-
Nov 1998
Reroofing.
-
Jan 2013
All work done only in one unit. renovate kitchen and bathroom. add new exh fan in the bathroom; all new lighting will be flourescent. remove old kitchen cabinet. update electgrical and plumbing under separate permit. no structural work.
-
Sep 2014
To comply with nov #201460171 dated 3/21/2014. interior remodel in one unit. remodel kitchen and bathroom at upper level. new bedroom, family, office and bath at lower level. new stairs connecting lower to upper level. n/a for the maher ordinance #155-13.
-
Sep 2014
#604: renovate kitchen and bathroom, all electrical and plumbing as needed. no alteration of wall, window and door.
-
Oct 2014
#105 - add new sprinkler head @ closet & relcoate head remodel area only. ref permit application 2014.0905.5582. n/a maher ordinance.
-
Sep 2015
Exploratory demolition at the basement level. temp remove lath and plaster for 200sf to observe sizes and locatoins of steel structural members. reinstall lath & plaster.
-
Oct 2015
One unit: interior remodel: provide 2 new bedrooms, 1 new study, 2 new bathrooms at the basement. remodel existing kitchen on 1st floor. provide new spiral stairs within the unit. sprinklers under sep permit. maher na.
-
Dec 2015
Work in one unit: remodel kitchen and bathroom. no walls to be altered or removed.
-
Feb 2016
Add two new sprinkler heads in one unit remodel area for closet maher na. ref 2015-1021-0316.
-
May 2017
One unit: renovate kitchen & bathroom, all in-kind, electrical/plumbing as needed.
-
May 2017
#108-interior remodel/expansion, expand one unit into basement storage room. provide interior spiral stairs. provide home office and new bath at basement, relocate living area and kitchen to basement. provide new bedroom at 1st floor. remodel existing bath at @ 1/f. sprinklers/alarm under separate permit.
-
Aug 2017
#303 - interior remodel ktichen & bath. replace cabinet, countertop, tile floor. replace bathtub, retile shower & floor. n/a maher ordinance.
-
Dec 2017
#108 -ti, extend existing sprinkler heads to new ceiling height with new heads/ total 16. maher na.
-
May 2018
One unit: remodel kitchen and bathrooms. fi or replace in-kind bathroom windows. paint unit. windows not visible from street/ lighting per cec 150.0(k).
-
Aug 2018
Phase 1 - like for like fire system replacement with upgrade with new panel. replace e smoke detector & pull stations with new at the same location. install modules to tie-in flow & fau per switches. connect e bell to new panel. local system. phase 2 - will comply with new sffc by 2021.
-
Aug 2018
One unit: remodel kitchen and bathroom. fix or replace bathroom windows. windows not visible from street. u-factor =.32 max. 5' x 8' bath, 12' x 7' kitchen. (2) total windows.
-
Sep 2021
One unit: renovated in kind kitchen and bathroom. electrical and plumbing as needed.
-
Jan 2022
#405: renovate in kind kitchen and bathroom. all electrical and all plumbing as needed.
-
Jul 2022
Fire alarm voluntary lf horns upgrade to meet sffc 2019 sec 1103.7.6.1.
-
Feb 2023
#408: none structural remodel. upgrade one kitchen: replace cabinet, countertop, tiles floor. one bathroom: replace bath tub, shower valve, vanity, tile shower and floor. in kind.
DBI holds 28 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 28. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update