855 Geary Street
Garage
-
1917
Built as garage, to the design of the architects O'Brien Brothers. Two storeys, reinforced concrete structure, two-part commercial composition, Renaissance/Baroque ornamentation.
-
1920
Built.
-
Jan 1992
Renewal.
-
Apr 2022
Change of use per planning from private parking to public parking. car share & bicycle parking at ground floor only per planning com motion no.20531. no change of use at basement or 2nd fl which remain private parking. no change of occupancy. all work is striping/barrier removal for ada parking.
-
Apr 2022
Basement/2 & ground floors: installation of charging infrastructure for plug-in hybrid electric vehicles, including: new electrical service & switch gear. electrical distribution equipment, ac/dc charging equipment. chargers @ gr/f to be installed in future permit.
-
May 2022
Two new vehicle lifts at basement level, and ada stair handrail upgrades. lifts are for maintenance only. no addition of new parking or alteration of striping approved under permit application 202204071820.
-
Jun 2022
Install 1 new 8" underground fire service from curb into building.
-
Jul 2022
1st fl- expansion of office to include new act ceiling, non load bearing walls and finishes. remodel and add one restroom and new platform for ada lift.
-
Sep 2022
New overhead fire sprinkler & standpipe system throughout. 418 total heads. ref t.i. pa202207259272. ref u/g pribuss fire service pa202206035536.
-
Sep 2022
Install (1) control pane, (4) dual monitor modules, (1) pull station, (1) smoke detector, (1) cellular communicator, (1) wall mount horn strobe, and (1) monitor module. ref permit application 202209192728.
-
Nov 2022
Install new electrical service/room, electrical equipment, pipe, wire, etc., for insall of (22) 180kw dc ev chargers & (17) 40a level 2 chargers.
-
Jan 2023
Install 2 water closets, 1 lavatory 1 break room sink, 1 restroom on-demand water heater, 1 floor cleanout, 1 weil duplex sump pump with fiber glass basin, 1 trench drain.
-
Feb 2023
Replacement parking garage entry gates and doors.
-
Mar 2023
Removal of existing striping and re-striping of ground floor garage only. memorialization of change of planning use from public to private parking; ref cua# 2022-005541.
-
Mar 2023
Revision to permit application: 202204132175. 1st floor installation of ev chargers within eixsting parking garage. added 2 mini-split condenser/fan coil units for the electrical distribution room. added direct-current fast charging. relocated distrib. panel. misc chnages per plans.
-
May 2023
Slab repair & provide repair details for damaged opening.
-
Jun 2023
Repair damabed and deteriorated portions of the e building. specifically slab and wall and elements.
-
Jul 2023
Repairs to damaged and deteriorated concrete slab, beam and wall elements on level 1 and 2.
-
Dec 2025
Reroofing no hot works.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline. 3 expired permits are not shown.
Nearby
- 846–854 Geary Street Same street
- 860 Geary Street Same street
- 835–839 Geary Street Same block
- 869–887 Geary Street Same block
- 823–829 Geary Street Same block
- 895 Geary Street Same block
- 920 Larkin Street Around the corner
- 753–755 O'Farrell Street Around the corner