990 Geary Street
Tenderloin · San Francisco, CA 94109
Permit history
-
Nov 1982
Additions alterations or repairs.
-
Jun 1989
Fire repair, wall framing and roof framing.
-
Jan 1998
Comply with umb ordinances, seismic retrofit-bolts-plus.
-
Jun 2001
Parapet repair work at east wall.
-
May 2014
Work in two units. remodel bathrooms, relocate kitchens, new bedrooms, new washer/dryer in each unit. remove non-bearing interior walls. new 3 in-fill non-bearing interior walls. lighting to remodelled areas. maher n/a.
-
May 2014
Work in one unit. remove non-bearing interior walls, new & infill non-bearing walls interior walls. remodel existing bathroom, relocate kitchen, new window at lightwell on 4th floor. new washer/dryer. new window to existing lightwell. lighting to remodelled area. maher n/a.
-
Nov 2014
#510- remodel kitchen & bathroom in kind, add new washer & dryer. n/a ordinance #155-13.
-
Apr 2016
One unit at 1st floor: : remodel existing kitchen. remodel existing bathroom and add washer and dryer, convert existing living room to bedroom. n/a for maher.
-
May 2016
One unit- remodel existing bathroom, relocate & remodel existing kitchen, convert existing kitchen into study room, add washer & dryer. n/a ordinance #155-13.
-
Jul 2017
#504- convert e kitchen to bedroom, relocate kitchen, convewrt e living rm to bedroom, relocate living rm, rehab e bath, install washer dryer. n/a ordinance #155-13.
-
May 2018
New fire alarm system that meets nfpa 72, cbc 907.2.9. complying with 1103.7.6.1.
-
Mar 2019
One unit - convert existing kitchen to bedroom; relocate kitchen, rehabilitate existing bathroom; install washer/dryer.
-
Sep 2019
#305 - convert kitchen to bedroom relocate kitchen, rehabilitate existing bathroom install with d.
-
Feb 2020
Ste 209: convert e kitchen to "study", relocate kitchen, rehabilitate e bath, install washer dryer.
-
Feb 2020
#210: convert existing living room to bedroom. rehabilitate existing kitchen, rehabilitate existing bathroom, install washer & dryer. maher na.
-
Aug 2020
Add seven (7) new accessory dwelling units to level 1 per oridnance 162-16.
-
Mar 2021
One unit: rebabilitate kitchen & bathroom. replace washer/dryer. upgrade line. all work in kind.
-
Jul 2021
One unit 2nd floor: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bath. install washer/gas dryer. no exterior work.
-
Dec 2021
One unit - convert existing kitchen to study; convert existing living room to bedroom. relocate kitchen; rehab existing bathroom; install washer/dryer.
-
Feb 2022
One unit: convert existing living room to study. relocate kitchen. rehab existing bathroom. install washer/dryer. install second bathroom.
-
Sep 2022
One unit - convert existing kitchen to bedroom. reloacte kitchen. rehab existing bathroom. install washer/dryer.
-
Oct 2022
One unit: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer & dryer.
-
Jan 2023
One unit. 1) convert existing office to bedroom. 2) rehab existing kitchen. 3) rehab existing bathroom. 3) replace existing washer & dryer.
-
Jun 2023
(one unit) removal of kitchen cabinets, bathroom sink, bathroom cabinet, bathroom wainscot tile 100 sq ft, sheetrock 400 sq ft in bathroom, kitchen, and entry hall. install new material in kind.
-
Jul 2023
4/f-5/f: tocomply with nov 202306594. repair to fire damaged units at six units, and corridors at 4th & 5th fl units.
DBI holds 83 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 83. 16 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update