1001 Polk Street
Tenderloin · San Francisco, CA 94109
-
1912
Recorded in the city's survey of the Van Ness Avenue automobile corridor as built for use as an auto showroom. The survey dates the work to 1912–1913. Designed by John Galen Howard as the Pierce-Arrow factory branch. It was the finest of the showrooms built away from Van Ness Avenue, and sold Pierce-Arrow and Reo cars into the 1930s.
-
Dec 1991
Furnish & install 1 ansul r-102 (3) gal wet chemical system.
-
Dec 1991
Final hook up of ansul fire system.
-
Apr 1997
Construct new 1-hr rated partition, 2-20 min doors & paitn.
-
Aug 1997
Reroofing.
-
Mar 1998
Build new partition.
-
Aug 1999
Installing heating & ventilation, new duct work, fr duct.
-
Jun 2001
Interior improvement @ 1st, 3rd & 4th fls: basemt-storagetm to meeting space, lounge inot offices. 1s.
-
Sep 2001
6 new sprinkler heads (3 heads in basement, 3 heads on 1/fl.).
-
Jun 2003
Install new fire alarm system.
-
Sep 2003
Waterproofing sidewalk over basement.
-
Jan 2004
Tie in elevator lobby smoke detectors for elevator recall, basement, 2nd, 3rd, 4th & roof will be se.
-
Jan 2007
Install 1 horn/strobe, relocate 2 strobes (2nd floor).
-
Jan 2007
Tenant improvment, relocate 5 fire sprinklers, 2nd floor.
-
Feb 2007
Correct address on plan previously approved #200701292768.
-
Apr 2007
Renovation of existing respite space at 2nd floor to provide 2 additional offices, reconfiguration of bed area for men and women. addition of accessible sink at hall for staff use. no change in # of beds/capacity. mechanical and electrical under seperate permit.
-
Mar 2009
Upgrade the automatic fire suppression system to the kitchen hood, using ansul ul300 wet chemical.fire alarm connection separate permit.
-
2010
Evaluated in the city's survey of the Van Ness Avenue automobile corridor and given California Register status code 3CS — individually eligible for the California Register, under Criteria 1, 2 and 3.
-
Jan 2011
Reroofing.
-
Sep 2011
Remove and replace 80 ton chiller. remove and replace economizer control dampers to control energy effeciency.
-
Jan 2012
Revise scope of work for 201109073981. remove and replace chw piping, remove and replace existing electrical disconnect with new, remove and replace existing chw dump with new.
-
Jul 2015
Shoring and underpinning.
-
Aug 2018
Installation of caltrans 1-a pole foundation over existing sub sidwalk basement.
-
Oct 2022
Partial replacement of the hvac system. existing ductwork to be re-used unless noted in the drawings. new fans and vav boxes controlled by co2 sensors. demolition and replacement in kind of rooftop fan penthouse walls and roof. minor structural repair of the structural slab under the geary, polk and cedar.
-
Jul 2023
Application of liquid applied traffic coating at geary, polk, and cedar st. sidewalks.
-
Feb 2025
Rev to permit #2022-1019-4651: new fire dampers added at new duct route.
-
Mar 2025
Level 2 and roof - fire alarm ti; adding 1 duct detector, 2 relay modules; 1 smoke detector to existing notifier nfs-640 fire alarm system. ref permit application 202210194651, 202502130239 (resubmitted mechanical).
DBI holds 31 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 31. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Submit an update