64 Golden Gate Avenue
Tenderloin · San Francisco, CA 94102
-
1910
Crim and Scott designed it for the Auto Service Company — an early garage east of Hyde Street, outside the Van Ness corridor.
-
Jul 1988
Reroofing.
-
Mar 1991
Remove existing concrete & wood floor const. at 2 locations.
-
Mar 1995
Comply with umb ordinance.
-
Sep 2004
Reroofing.
-
Sep 2004
Renew permit app#9503419.
-
Oct 2007
Renew permit application 9503419, #200409154158 for final inspection.
-
Dec 2020
Fire rebuild: new roof, roof trusses, electrical, plumbing, drywall. to comply with nov 202025050.
-
Apr 2024
Repair to failing wall during construction of existing permit. the repair consists of 3'10" in height of cmu to be placed over existing masonry wall fora length of 160 feet on the south and east side of building.
-
Jul 2025
Revision to permit application 202012241726: additional seismic structural hardware added.