39–41 Jones Street
Tenderloin · San Francisco, CA 94102
Permit history
-
May 1983
Additions alterations or repairs.
-
Jul 1988
Parapet reinforcement.
-
Jun 2001
Umb-seismic retrofit works - general procedure.
-
Jun 2002
Comply with nov 200228467 for floor repair.
-
Jun 2003
Fire sprinkler installation to meet sro retroactive sprinkler installation ordinance.
-
Aug 2003
Umb general procedure. seismic upgrade.
-
Apr 2005
Replace 84 windows in kind, comply with nov 2001172304 & 200228467.
-
Jun 2005
Renovatings 30 bathrooms incl replacing framing, plumbing, electrical, drywall, tiles on six floors.
-
Oct 2005
Relocate and install fire sprinkler in new bath, shower. 2nd through 7th floor.
-
Oct 2005
Upgrade existing fire alarm system to meet current code.
-
Dec 2005
Creating of counselors rm and accessible bathrm at g/f level for hotel residents opening non bearing wall between hotel lobby and created space.
-
Dec 2005
Detail change on top connection on steel frame for appl#200308061326.
-
Aug 2006
To renew expired permit application 200308061326, #200512099945.
-
Oct 2006
New partitions, aluminium frame store front, new unisex, ada compliant restroom + demolition for new scope of work. new front entry.
-
Apr 2007
Installation of 2 new hvac systems according to mechenical drawing. reference to app #200610316438 r1.
-
Sep 2007
Install fire sprinkler system from existing 4" main on g/f & mezz. only.
-
Nov 2007
Install new fire sprinkler system on basement floor. connect to existing fire sprinkler. new 12 sprinkler heads.
-
May 2013
To comply with ordinance 029-13 only; installation of grab bars in sro at the following location: 41 jones st 2nd - 4th floor.
-
Jun 2016
Modifications to fire escape. removing bottom landing & accordian ladder, re-installing bottom landing five feet higher & provide new ladder down to the new steel grate walkway in north alley of 1 jones st (under sep. permit).
-
Aug 2017
Add laundry services to existing space. new dedicated outlet. new plumbing, new exhaust duct. no new walls.
-
Feb 2019
Alteration to existing office space at lower level floor and new kitchenette remodell at mezzanine floor, also includes new lightitng & fixtures at new office #2, new replacement fixtures, cabinetry, at mezzanine level.
-
May 2023
Fire alarm system replacement and new lf horns to meet sffc 2022.
-
Sep 2025
Proposed new comon kitchen addisiton with existing common area at ground floor. no residential rooms will be removed.
-
Jan 2026
Install 84 lf sounders in sleeping area for all floors. install new telguard commnunicator and mini module, 2 power supply. install graphic annuciator mini modules for water flow on each level. replace existing strobe inside toilet/bathroom on 2/f to 7/f. replace existing horn strobe with new horn strobe.
DBI holds 55 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 55. 5 of them are nominal $1 street-space or sidewalk permits.