44 Mcallister Street
Hotel
-
1922
Built as the Salvation Army Girls Hotel/Young Women's Boarding Home of the Salvation Army/The Evangeline, rooming house with 211 rooms and 14 baths, to the design of the architect Norman R. Coulter. Eight storeys over a basement, reinforced concrete structure, three-part vertical composition, Renaissance/Baroque ornamentation.
-
1923
Built.
-
Oct 1983
Additions alterations or repairs.
-
Apr 1986
Code related rehabilitation.
-
Apr 1990
Repair patch plaster, carpet, paint interior.
-
Jun 1990
Patch minor plaster & sheetrock, painting.
-
Apr 1993
Upgrade existing electrical heating & fire safety systems paint int/ex.
-
May 1993
Revis appl9305884/install shear wall panel at bsmt/ground fl.
-
Jan 1994
Fire sprinkler alteration.
-
Jul 1994
Upgrade existing fire safety systems.
-
Jan 2007
Renovation of existing building, maintain the same number of units; relocate some existing partition walls; installation of new horizontal addition elevator tower; renovation of common bathrooms, shoklers & toilets; (n0 plumbing at (e0 sro units, site permit, separate permit for fire alarm & sprinkler.
-
Nov 2008
Revise existing fire sprinkler system and replace all sprinkler heads with fast response in public areas and residential heads inside units. total 956 heads.
-
Dec 2008
Revision to 200701242425: work consists of ultrafine cement/permeation grouting of the sands for the new elevator pit and part of the adjacent retaining wall footing.
-
Jul 2009
Provide a new fire alarm system with auto. voice evacuation message. system to monitor sprinkler system. provide elevator recall functions. release fire doors. provide area smoke detection for res. corridors & common areas. manual pull stations at stair landings and exits.
-
Jan 2010
Provide structural sidewalk slab for pg&e vault. revision to 2007/01242425-s4/r2.
-
Jan 2010
Add partitin wall/mechanical. at ground floor, per pg&e request for gas meter room. revision to 2007/0124/2425-s4/r2.
-
Jun 2010
Install ten (60) evacuation signs for sffd review of new construction ( not completed yet).
-
Sep 2010
Revision to permit application 2007-0124-2425 to replace 56 single glazed windows with double glazed, all are same size as original. nov#201044498-bid, 200993147-pid, 201063971-pid, 201063976-pid.
-
Nov 2010
Install 2 security gates at existing exterior exit paths, within existing property line.
-
Mar 2011
Revision to permit application 2007.01.24.2425 s4, delta #10 dated 23/15/11. revisw title 24 adapatable units fromunit#s g10, 220, 320, 520, 620, 720, 820. to seven units. revisions to plan lay out urh 2, 3, 4/ no exterior work under this permit. total# of adaptable units to remain the same.
-
Nov 2017
Reroofing.
-
Sep 2018
Installation of new solar system.
-
Dec 2019
Install new power supply panel and new door hodler on lower level & groudn floor for new doors, new devices will be tie-in to existing control panel on ground fl. ref pa 2009-0702-1899.
-
Jun 2021
#217: remove and replace existing sheetrock & replace insulation. non-structural work. no new walls. (insulation, sheetrock, framing "like for like").
DBI holds 37 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 37. 6 of them are nominal $1 street-space or sidewalk permits. 2 expired permits are not shown.
Nearby
- 54–70 Mcallister Street Same street
- 1 Jones Street Same block
- 39–41 Jones Street Same block
- 121 Golden Gate Avenue Same block
- 133 Golden Gate Avenue Same block
- 1100–1112 Market Street Around the corner
- 10–50 United Nations Plaza Around the corner
- 1083–1087 Market Street Around the corner