1964
Built.
-
1970
The Hilton hotel tower, by Stone, Marraccini & Patterson with John Carl Warnecke.
-
1979
The downtown Airlines Bus Terminal stood on this corner of O'Farrell and Taylor until it was demolished in 1979, leaving the lot vacant.
-
Dec 1988
Expansion of exist cafeteria, new kitchen equipment.
-
Sep 2000
Interior renovation of 568 guestrms inc. new finishes.
-
Mar 2001
Remodel 380 guestrooms tower 3 floors partly/16/17/18/19 including 7 fully access. rooms.
-
Jul 2001
Fire alarm upgrade tower i bckbone & floor 7-46, 2-3 backbone only.
-
Sep 2001
Replace sliding glass doors on 16-19th floors of int. area surround pool on tower 3 & 160 units.
-
May 2002
Remodel basement space from restaurant to spa, remodel 1st story retail space to fitness room.
-
Jun 2002
Fire alarm upgrade floors 5 to 20 in tower iii.
-
Dec 2002
Remodel 153 rooms floors 5, 6, 7, 8, 9, 10.
-
Nov 2005
All interior work, no exterior alterations.remodel bathrooms, convert some bathtubs to showers, new lighting & switches, install new toilets in existinglocations.new bathroom doors.remove select connecting doors, furrout wall in some location.no ada renovations building.is in compliance.
-
Jun 2007
Demolition existing restaurant area for new meeting space and install new restaurant in former bar area. work on 1st floor.
-
Sep 2008
Interior tenant improvement to existing plaza. scope of work to inclcude new finishes, lighting and electrical work. existing mechanical. system to remain as is. groundfloor only. remove & cap existing fire hose cabinet. fire sprinkler in separate permit.
-
Oct 2010
Voluntary seismic retrofit consisting of new concrete shearwalls in selected bays. relocation of employee entrance and offices on ellis st to facilitate the instalation of new shearwalls.
-
May 2011
Reroofing.
-
Jul 2011
Remodel of existing ballrooms (ballroom level). new lighting and interior finishes in continental ballroom, pre function areas and public restrooms.
-
Jul 2011
Remodel of existing meeting rooms on floors 4 and 6. new lighting and interior finishes. remodel existing bathrooms. limited amount of work on floors 3 & 5 shafts as shown on plans.
-
Aug 2011
Interior non struc remodel of 498guest rooms in tower #3. remodfel bathrooms and interior finishes. new unit entry door on all 550 rooms in tower#3. all existing mechanical system to remain. all restroom lighting shall be high-efficacy or occupancy sensor control per cec 150(k). verify door listing.
-
Apr 2012
A new manned telecommunications facility consisting of new equipment room with a batter rack, new p.c. power plant (9) 19" das equipment with 16 rru's gps antenna, 12 rruw, 475 das antennas 34 fiber repeaters & 389 splitters.
-
Aug 2013
Renovation of 566 guest rooms in tower 1 on floors 7 - 44. this is inclusive of new plumbing fixtures at existing locations. all new finishes & new light fixtures with equal wattage (or less) at existing locations. mechanical system to remain.
-
Apr 2015
Renovation of existing ground fl lobby to include new bar with lounge seating & nearby dining areas. alterations to include new finishes, lighting, furniture, millwork & food service equipment. scope also includes upgrades to existing interior ramp to become fully accessible. l/s and sprinklers under sep.permit.
-
Apr 2016
New plumbing and finishes for 389 guestroms in tower 2 on floor 7-23. n/a for maher ordinance no.155-13.
-
Aug 2017
Floors 5, 8, 9, 10, 11, 12, 14 - replacement of existing guest room & back of house doors. n/a maher ordinance.
-
Aug 2018
Inerior remodel of 2nd fl. meeting spaces, public toilet rooms and adjacent atruim/escalator space extending from ground fl. lobby to 4th fl. with new finishes and decorative lighting, public toilets upgradded for current code compliance with no change in fixture count.
-
Oct 2019
Interior remodel of grand ballroom at 3rd fl and adjacent atrium/escalator space extending from gr fl lobby to 4th fl. public toilets at 1/2 level above ballroom to be upgraded to comply with current accessibility codes. 2 unisex bath within meeting room suites will be upgraded. scope includes new.
-
Dec 2020
Electrical deferred submittal of approved project # 201910306012. interior remodel of grand ballroom at the 3rd floor and adjacent atrium, escalator space extending from the ground floor lobby to the 4th floor.
-
Dec 2023
Removal of existing skylight and associated equipment. new roof infill at existing skylight opening. new junction boxes for two new decorative light fixtures on 46th floor. life safety deferred.
DBI holds 348 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 348. 30 of them are nominal $1 street-space or sidewalk permits. The Modern design context statement dates the hotel tower to 1970 in one place and 1971 in another.
Nearby
- 270–272 Ofarrell Street Same street
- 401–411 Ofarrell Street Same street
- 201–229 Ellis Street Around the corner
- 281–285 Ellis Street Around the corner
- 275 Ellis Street Around the corner