621 Taylor Street
37-unit apartment building · Tenderloin
-
1913
Built.
-
1913
The Hotel Florence.
-
Mar 1987
Remodel four units #43/no structural.
-
Apr 1987
Remodel eight units. no structural.
-
Jul 1987
Replace existing pullman kitchens carpet & paint.
-
Mar 2007
#4- kitchen/bath remodel in kind. no structural changes. building, plumbing & electrical code upgrades. no window or door changes. kitchen- at least 50% of lighting wattage must be fluorescent. bath- fluorescent or controlled by montion sensor.
-
Jun 2007
#62-kitchen/bathroom remodel in kind.no structural changes.building, plumbing & electrical code upgrades.no door window or wall alteration.kitchen: at least 50% of lighting wattage must be fluorescent.bath: fluorescent or motion controlled sensor.exhaust termination 3'min.from pl & building. opening.
-
Aug 2007
One unit kitchen/bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen: at least 50% of lighting wattage must be fluorescent. bath fluorescent of motion controlled sensor. exhaust termination 3' min from p.l & building openings.
-
Aug 2007
One unit kitchen/bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen: at least 50% of lighting wattage must be fluorescent. bath fluorescent of motion controlled sensor. exhaust termination 3' min from p.l & building openings.
-
Aug 2007
One unit kitchen/bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen: at least 50% of lighting wattage must be fluorescent. bath fluorescent of motion controlled sensor. exhaust termination 3' min from p.l & building openings.
-
Oct 2007
Kitchen and bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen at least of lighting wattage most be florescent. bath: flourescent or motion controled sensor exhuast termination 3' min from p. l. and building openings.
-
Oct 2007
Kitchen and bathroom remodel in kind. no structural changes. no windw door or wall alterations. kitchen atleast 50% of lighting must be flourescent. bath fluorescent at motion controlled sensor. exhaust termination 3' min from pl and building openings.
-
Dec 2007
Work @ one unit only. new kitchen & bath remodel. no structural. cabinets, counter top, tile, florescent light.
-
Jun 2008
Two units kitchen + bath remodel cabinet, counter, tile, fluorescent + light.
-
Jul 2008
One unit. new kitchen cabinets + bath remodel. non structural cabinets, counter, tile & no structural work.
-
Sep 2008
Install fire suppression system (ansul) in existing restaurant kitchen hood.
-
Aug 2011
Remove (1) bathroom flooring, underlayment and shower to reveal dry rot. repair/replace all dry rot in floor joists, supports and underlayment. bathroom floor will be replaced with sheet vinyl and new fiberglass shower surrround will be installed. all repair in kind. no change to walls, window or.
-
Dec 2012
Voluntary panel upgrade in fully sprinkler building. replace like for like control panel with new sk-2 panel at the same location on 1st floor. replace like for like existing smoke detectors at the same location. tie-in existing bells and pull stations to new control panel.
DBI holds 35 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 35. 6 of them are nominal $1 street-space or sidewalk permits. 8 expired permits are not shown.
Nearby
- 615 Taylor Street Same street
- 624 Taylor Street Same street
- 625 Taylor Street Same block
- 627 Taylor Street Same block
- 620 Post Street Same block
- 600–612 Post Street Same block
- 611–615 Post Street Around the corner
- 617–619 Post Street Around the corner