101–105 Turk Street
Tenderloin · San Francisco, CA 94102
Permit history
-
Jun 1982
Additions alterations or repairs.
-
Nov 1982
Additions alterations or repairs.
-
Oct 1986
Replace burnt roof, brace parapet.
-
Nov 1993
Urm upgrade per 92-225.
-
Dec 2008
Space #55 taylor. tenant improvement. studios & gallery. gray area gallery. mep under seperate permit.
-
Aug 2010
Exterior demolition & storefront remove glass & brick-replace with new glass & aluminum systems; structure to remain.
-
Oct 2012
Reroofing.
-
Jun 2013
Space #55-renovate existing vacant art gallery space into an art/music gallery. existing a-3 occup & existing gallery use & musical performances will added to space. tenant improvement include new walls, new theatrical trusses, new doors & renovation of elecl & mechanical systems. new occ load verification req.
-
Feb 2014
Eight units. remove existing kitchen cabinets, provide electrical. & plumb. to all units. new kitchen & bath remodel for all units. install granite floors, paint & refinish flooring or provide laminate flooring.
-
Apr 2014
Renovate existing ground floor exterior storefronts, remodel of existing residential lobby and existing manager's unit. n/a ordinance #155-13.
-
Jun 2014
Remove existing cabinets, supply electrical & plumbing to new kitchen and bath remodel for six units. provide laminate flooring or refinish hardwood. paint apartment. compliance with ord 155-13 not required.
-
Aug 2014
Four units remove existing kitchen & bath cabinets. relocate plumbing and electrical to new locations. tile kitchen & bath floors. install laminate flooring or redo hardwood. paint apartment. no removal of walls. compliance with ord 155-13 n/a.
-
Sep 2014
Remove 2 x 14 beams + replace with psi, install i beams on 1st floor & double up an existing floor joist & install tap flange hangers & plywood floor. n/a maher ordinance.
-
Nov 2014
Repair of vaulted sidewalk. ref.2014.0409.2804. maher n/a.
-
Nov 2015
Commercial ti, scope of work involves new interior walls, floor and ceiling finishes, kitchen equipment, restrooms and light fixtures. the new restaurant will have an updated mechanical, electrical and plumbing system. maher na. no exterior changes under this permit application. maher not req.
-
Aug 2019
Volutary upgrade of fire alarm with like for like panel and addition of wireless low frequency sounders in all sleeping areas to meet code 1103.7.6.1 n/a for maher.
-
Aug 2019
Existing fire sprinkler system ti 101 sprinklers.
-
Sep 2019
T.i. on ground & b/ fl. new foot/facial massage, coffee bar, yoga studio, accessiible restrooms, platform lift, staff rooms, new partitions, lighting, mechanical, electrical & plumbing, no exterior changes.
-
Jan 2021
One unit: rehabilitate existing kitcen, rehabilitate existing bathroom. install washer & dryer in existing closet. no framing work, no structural work.
-
Nov 2021
#334. convert existing kitchen to bedroom. relocate kitchen, rehab existing bathroom, install washer and dryer.
-
Nov 2022
Erect a 18-story over one basement level, type i, mixed use building with 116 residential units and assembly.
-
Nov 2022
Demolish an existing 1-story, type 5b, commercial building at 105 turk st address, as wll as surface parking in order to build a residential building on the property. existing 5-story residential building on the same lot to remain.
-
Apr 2023
Alteration of sub-sidewalk basement roof slab to install new sidewalk.
-
Jun 2023
One unit: remodeling existing one kitchen. remodeling existing one bathroom. no moving walls. no exterior work.
DBI holds 114 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 114. 10 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update