1001–1031 Franklin Street
Western Addition · San Francisco, CA 94109
-
Dec 1983
Additions alterations or repairs.
-
Aug 1985
To bring into code.
-
1990
First United Lutheran Church, which called an openly gay pastor in 1990 and was suspended by the Evangelical Lutheran Church in America that year and expelled on 31 December 1995.
-
Feb 1994
Instl autoi gate @ garage, 2 pedes wlk gates, secur fence.
-
Feb 1998
Remodeling to add to office space-new walls, doors, handicap.
-
Sep 1998
Renewal of application 9803369.
-
Oct 2002
Exterior stair in open parking lot, also temporary stair during const.
-
Oct 2002
Four hour fire wall and reconfigure pedestrian bridge, plaza exit stair.
-
Feb 2003
Upgrade fire life safety for existing highrise building.
-
Oct 2005
Voluntary exterior seismic upgrade. accessibility upgrade to publicly accessible space in the 13 story residential tower.
-
May 2006
Fire alram system tenant improvement.lobby renovation/system 2 years old. strobe/smoke det coverage to be updated in lobby. lobby bathroom and building management office shall also be renovated. all renovation to be fire alarm upgrades.
-
May 2006
Reroofing.
-
Aug 2006
Renew permit application 200302/27/8442 for final only.
-
Oct 2006
Tenant improvement. fire alarm modification. the system is 2 year old in the building. due to changes in the lobby, strobe coverage & sd coverage is modified. as built to be submitted as a seperate application. ref permit application 2006/05/09/1138.
-
Nov 2006
Add two fire smoke dampers.
-
Dec 2006
Revision permit application 200510246401, remove stairway from east side of the landscape area to franklin street. from the scpe of work. revise exit path.
-
Apr 2009
Install automatic barrier arm for parking lot entrance.
-
Jun 2010
Interior remodel to 3rd.floor. urban life cnt.work includes dividing 1-large off. into off. open work rm. & reception, wait area. re-installation of sink/counter @ breakrm.&newcarpet, paint-coat casework @ 2-offices.ada upgrade to men's & women's toilet rms. 3rd.floor.only.no ext.work.mep under sep.permit.
-
May 2017
Reroofing.
-
May 2018
Replace 270 windows and 130 sliding glass doors with in-kind aluminum frames, to be installed on concrete with reinforced steel building. process of install begins on north facade working south.
-
Jun 2019
No work performed on existing structure. drawings for sffd occupancy load only.
-
Oct 2019
Proposed roof and walls at existing staircase.
-
Aug 2022
Priority processing - to construct a 7-story, 94 dwelling units, type 3a over 1a, senior affordable housing. residential building.
-
Nov 2023
Remove old 3' fence and install new 8' fence. (frnce not at public right awway.
-
Apr 2024
To verify existing sound levels in sleeping areas, complying with sffc section 1103.7.6.1.
4 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early residents. Submit an update