1971
International Longshoremen's and Warehousemen's Union Headquarters, designed by Anshen + Allen.
-
1973
Built.
-
Jul 1984
Modification to existing office area at the 3rd floor.
-
Aug 1984
Phase i of work is to expand lower level of building.
-
Oct 1984
Structural framing, concrete, elevator relocation.
-
May 1985
Demolition, metal studding, electrical. etc.
-
Nov 1985
Metal studs, drywall, electrical, ceilings.
-
Jun 1988
Tenant improvements, sus. acous. clg., gyp bd partitions.
-
Jul 1988
Suspended acoustic clg, gyp bd partitions, add finishes.
-
Oct 1991
Demolition of of 40% ofinterior partitions.
-
Jun 2000
Lobby revisions.
-
Feb 2002
Tenant improvement to include studwall framing /dry rot/plmg/millwork paint and carpet.
-
May 2002
Install new metal stud and drywall paritions with new electrical, new kitchen with appliances/cabinets, pai.
-
Dec 2003
Renew: 200205086063 ready for final inspection.
-
Feb 2004
Demolition of metal stud wall and dry walls, adding elevator smoke doors.
-
May 2007
Oti-1, leonard carder, 2nd fl, el, me.
-
Mar 2012
New unmanned telecom facility consisting ofnew8'-9"x 27'-8" at&t equip platform with 2new2206 rbs cabinets. 6 new 6601 umts rbs equipment units, new 6601 lte rbs equipment unit, & new dc power plant inside new sunwest cabinet, new telco parcell cabinet, new ciena unit.
-
Dec 2013
T.i. of 2nd floor unoccupied offices and reconfiguration of the common corridor to connect this space to an occupied suite. plumbing & electrical under separate permit.
-
Mar 2014
Reroofing.
-
Apr 2017
Att modification: r&r 6existing antennas, with 6 new antennas, 9existing rrus with 6 new rrus; install 2 new xmu, 2 new fiber, remove unused equip. paint antennad to match.
-
Feb 2020
To comply with abe program per ord 51-16 barrier removal @ existing exterior ramp & primary entry. technical infeasibility & equivalent facilitation per ord 51-16. no structural work. no mep work, no sidewalk work.
-
Jul 2020
Removal & upgrade of panel antennas, rrus, battery strings as well as other upgrades at equipment level/in cabinet.
-
Feb 2022
At&t: remove and replace 6 antennas. remove 6 rrus, relocate 3 rrus. install 3 new dc9 boxes, (3) 6awg dc power trunks to new dc9's. install 1 new stackable battery enclosure with 8 new 190ah batteries within. 4 new rectifiers in existing dcpp. remove (12) 155ah, 2 duw and (1) 5216. install 3 support beams.
-
Jan 2023
Comply with abe program per ord 51-16. barrier removeal at e exterior ramp and primary entry. technical infeasibility and equiv facilitation per ord 51-16. no structural work. no sidewalk work, no mep. abe 201911228634. (all exterior work to be done b a-contractor; door operator by c-28 contractor).
-
Sep 2024
2nd fl - expansion of existing office including new suite entry, non bearing partitions, new doors & exit signs.
-
Nov 2024
Suite 201; expansion of existing suite including new non-bearing portiions, lighting, suspended ceiling electrical and finishes. mechanical and electrical work under separate permit.
-
Dec 2025
Recommencement and completion of work approved under permit application 202007230746.
DBI holds 45 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 45. 1 of them are nominal $1 street-space or sidewalk permits. This building's context statement dates the work 1971; the assessor's roll records the parcel as built 1973.