2001 Mcallister Street, Unit 11
Condominium unit in 1750–1760 Fulton Street
-
Aug 2019
Common area: window and shingle repair. demolition and remove shingles and replace "shakertown shingles" fulton st elevation 3 locations, new water proofing "jumbo tex 60 min". replace 2 windows total in two units courtyard.
-
Jul 2021
Interior remodel, add new wall to common room to make into separate common room/ package room with new door to io.
-
May 2022
To install a independently powered cellular radio to the fire alarm system.
-
Sep 2022
Bathroom remodeling remove existing tub, convert to shower, replace all tile, wall and floor, replace shower valve to use same drain & same plumbing.
-
Jan 2024
Existing fire alarm system that has audible appliances that achieved the sound pressuire level requirements of nfpa 72-2022. audibility test results performed by a licensed c-10 contractor to demonstrate audibility compliance are shown.
-
Sep 2024
Cut existing weld on concrete landings to the stringers, remove existing concrete landing from 2 locations and remove temporary plywood from one landing. set new concrete landings in place and weld to the stringer, clean up and dispose of all debris. patch approx 20lf of stucco entrance area.
-
Jan 2026
Existing fire alarm system that has audible applinces that achieved the sound pressure level requirements of nfpa 72-2025. audibility test results performed by a licensed c-10 contractor to demonstrate audibility compliance as shown.
2 nominal $1 street-space or sidewalk permits are omitted from the timeline.