2421–2425 Geary Boulevard
Western Addition · San Francisco, CA 94115
-
1860
Excavation for the north wing and garage would reach ground where a cemetery is known to have stood as early as 1860.
-
1952
Built.
-
1953
The Kaiser Foundation Hospital, 1953, by Wolff & Zimmer.
-
1966
Additions and renovations to the hospital were completed, the first of two rounds in the 1960s.
-
Sep 1978
Created during job card conversion on: 03/04/83.
-
Sep 1978
Created during job card conversion on: 03/04/83.
-
Jan 1980
Additions alterations or repairs.
-
Oct 1980
Created during job card conversion on: 03/04/83.
-
Oct 1980
Created during job card conversion on: 03/04/83.
-
Dec 1980
Created during job card conversion on: 03/04/83.
-
Feb 1982
Additions alterations or repairs.
-
May 1982
Building use: hospital.
-
Feb 1983
Fire safety improvements.
-
Jun 1983
Additional surgery room.
-
Sep 1983
Additions alterations or repairs.
-
Oct 1991
Instsall microwave equipment in existing equipment room.
-
1992
A new north wing and a major renovation of the east wing were completed, creating a street-level main entrance off Geary Boulevard.
-
Jun 1992
Add new sprinklers under new mezz floor in existing mechanical room.
-
Aug 1994
Create pedestrian walkway @ s. side of geary.
-
Aug 1995
Pour slab hookup sewer & electrical, instll alum prefab building.
-
Mar 1996
Erect a one story espresso bar-pre-fabricated.
-
Sep 1996
Loading dock replacement.
-
Mar 2003
Remove & reinstall handicap camp to meet ada requirements.
-
Mar 2004
Minor regrading and repaving of existing 2nd level loading dock drive entrance.
-
Sep 2012
To erect a projecting electrical sign.
-
Jan 2013
Erect 1 illuminated monument sign.
-
Jan 2013
Install 1 double face, illuminated directional sign.
-
Sep 2018
12th floor providing 4 new ducts for a new pharmacy. mechanical system, located on mezz level. 3 ducts are located on recessed section of front facade, painted to match existing building color, they will be hidden behind existing trees. administrative for building. see notes on drawing a0.02.
-
Feb 2025
Phase replacement of chillers (ch-i & ch-3) located on the ground level of the meeb building and chiller (ch-2) located on the mezzanine level of the east wing building. project also includes replacement of associated chiller pumps, supporting infrastructure, and adds architectural enclosure for.
DBI holds 89 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 89. 58 of them are nominal $1 street-space or sidewalk permits. The Modern Architecture and Landscape Design context statement dates the Kaiser Foundation Hospital to 1953; the Planning Department's 1996 environmental impact report for the Geary campus says the original portion of the hospital was completed in 1954.