1018–1090 Golden Gate Avenue
Western Addition · San Francisco, CA 94115
-
1970
Thomas Paine Square Apartments, developed by Bethel A.M.E. Church in the redevelopment era.
-
Mar 1993
Repair fire dmg-new drs on closet-wood shingles-window glass.
-
Dec 2001
Reroofing.
-
Dec 2001
Reroofing.
-
Dec 2001
Reroofing.
-
Dec 2001
Reroofing.
-
Dec 2001
Reroofing.
-
Dec 2001
Reroofing.
-
Dec 2001
Reroofing.
-
Dec 2001
Reroofing.
-
Jun 2008
Work @ one unit only. drywall, electrical, insulator, install cabinets, windows, doors, siding, plumbing. drywall living room, hall, bedroom, new cabinets in kitchen & bathroom. replace bedroom windows & living room sliding door in kind. replace front shingles in kind. replace front security gate in.
-
Apr 2018
Soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. add steel moment frames and stregthending of existing shear walls at 1st floor only. all work for lateral force resistance. no new vertical load carrying elements included.
-
Apr 2018
To comply with #201715451. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. add steel moment frames and stregthending of existing shear walls at 1st floor only. all work for lateral force resistance. no new vertical load carrying elements included.
-
Aug 2022
Remove complete asphaltgravel remove complete fleshing metals. prepare for new installation bitumen to arch down membrane. install new flashing metals install final layer granulad bitument torch down -one unit-1030.
-
Aug 2022
Emove complete asphaltgravel remove complete fleshing metals. prepare for new installation bitumen to arch down membrane. install new flashing metals install final layer granulad bitument torch down -one unit-1015.
-
Oct 2022
Building #1: window replacment. provide and install 28 window and 15 patio sliding doors. all to be retrofit vinyl window like for like.installation not enlarging or reducing existing frame opening. white color same device operation meeting title 24 & safety glazing where needed.
-
Oct 2022
Building #2. to comply with nov #202291744, #202292748. provide & install 37 window all to be retrofit. white vinyl windows like for like installation. not enlarging or reducing existing frame opening same device operation meet title 24 & safety. glazing where needed.
-
Nov 2022
Building #3: to comply with 202291744. some visible from the street & some facing the court yard.provide & install 49 windows. all to be retrofit. white vinyl windows like for like installation. not enlarging or reducing existing frame opening same device peration meet title 24 & safty glazing where needed.
-
Nov 2022
Building #4: to comply with 202291744. some visible from the street & some facing the court yard.provide & install 46 windows. all to be retrofit. white vinyl windows like for like installation. not enlarging or reducing existing frame opening same device peration meet title 24 & safty glazing where needed.
-
Nov 2022
Building #5: windows change out to comply with 202291744: provide and install (57) windows. all to be retrofit white vinyl windows. like for like installation not enlarging or reducing existing frame opening. same devile operation. meet title 24 and safety glazing where needed. max u-factor 0.30.
-
Nov 2022
Building #6: windows change out to comply with 202291744: provide and install (28) windows and (14) patio slider doors all to be retrofit white vinyl windows like fo rlike. not enlarging or reducing existing frame opening. same same devile operation meet title 24 and safety glazing where needed.
-
Nov 2022
Building #7: windows change out provide and install 88 windows all to be retrofit vinyl windows like for like installation not enlarging or reducing existing frame opening same device operation meet title 24 and safety glazing where needed.
-
Nov 2022
Building #8: windows change out provide and install 30 windows and 13 pation slider doors all to be retro fit white vinyle windows like for like not enlarging or reducing existing frame onpenig same device operation meet tiltle 24 and safety glazing were needed.
-
Aug 2023
One unit: remove replace kitchen cabinets. remove replace bathtub. remove main panel out of closet. remove and replace flooring. update electrical bathroom & kitchen. kitchen and bath remodel.
-
Dec 2023
Reroofing.
-
Feb 2024
Building #8 refoofing.
DBI holds 54 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 54. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update