1201 Golden Gate Avenue
Western Addition · San Francisco, CA 94115
-
1970
Fellowship Manor, developed by Bethel A.M.E. Church in the redevelopment era.
-
Jul 1992
Minor sheetrock repair, replace cabinets & paint.
-
Aug 1992
Replace existing cabinets, carpet and vinyl, ceiling tiles.
-
Aug 1992
Reroofing.
-
Sep 1997
New entry access doors at front & rear entrances.
-
Sep 1997
Cellular equipment cabinet and small antenna to be installed.
-
Jul 2008
Install fire suppression system only for existing hood/duct.
-
Jul 2010
Install emergency generator for elevator @ basement.
-
Jun 2019
Interior alterations for daily use as a women's shelter. construction of showers and restroom facilities. accessibility ramp and pathway. mep under separated permit.
-
Dec 2019
Demolsih interior partitoins and finishes within 5 units. construct 5 mobility units with new casework, fixtures, finishes.
-
Feb 2020
Remove striping on non compliant ada stall. install striping for new ada van parking stall.
-
Mar 2021
Reroofing.
-
Dec 2024
Upgrade fire alarm system to comply with 2022 sffc section 1103.7.6.1, ab#3.08, ab# 2.01 and 2022 cfc, cbc and nfpa 72-2022. the replacement of fa system shall be automatic and manual system with one pull station located next to the facu since the building has a fully sprinklered system.
-
Jun 2025
#403: countertop replacementin kitchen.
-
Aug 2025
One unit: install new flooring, replace electrical wiring, new tub install, sheetrock and installation.
-
Dec 2025
One unit: new kitchen countertops, adding electrical outlets and updated plumbing in kitchen.
-
Jan 2026
One unit: new kitchen countertop.
-
Jan 2026
One unit: new kitchen countertop.
3 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Submit an update