455–459 Sanchez Street
Castro (Eureka Valley) · San Francisco, CA 94114
Permit history
-
Jan 2026
One unit: remodel bathroom and kitchen. install insulation and new drywall. new electrical and plumbing. replace gas line. replace existing hvac.
-
Feb 2024
Ref permit application 202205103912 in addition to work already approved. removal of plaster & installation of 5/8" gyp board type x per plan. 9 windows repplacement @ sid & rear (not facade) & rear door replacement.
-
May 2022
Remodel bathroom & kitchen. install insulation & drywall. new electrical & plumbing. replace gas line. replace existing hvac no wall or laout changes. bath tiles: fixtures: replace tub/ shower. kitchen cabinets appliances sink countertop.
-
Oct 2020
Remodel bathroom and kitchen install insulation and new drywall. new electrical and plumbing. replace gas line. replace existing hvac.
-
Jun 2018
Soft story retrofit per 2016 sfebch chapter 4d engineering criteria 2016 cebc appendix a4.
-
Dec 2004
Steel reinforcement of existingwooden beam & joist.
-
Nov 2002
Repair & replace where needed backstairs of 6 unit bldng-start of work insp. req'd before demolition work.
-
Sep 1990
Introduction of plywood shear walls & concrete.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.