Aug 1982
Additions alterations or repairs.
-
Sep 1984
Remove existing vertical glazing on 1st floor.
-
Nov 1995
Remodel 18 guest bathrms for handicap accessibility/provide.
-
Nov 1995
Provide retrofit sprinkler system.
-
Jan 1996
Install a new life safety system, automatic fire alarm system.
-
Nov 2002
Convertexistingconference rooms to hotel health spa-mep under separate permit sprinkler under sep permit.
-
Nov 2002
Convert existing offices on 4th floor, into hotel conference rooms. add new m & f ada public toilet facilit.
-
Mar 2003
Hvac, electrical, lifesafety, fire sprinkler. tenant improvement including treatment rooms, reception are.
-
Dec 2003
Removal & replacement of existing storefront (11) bays, 22' wide x 30' high at washington st. & merchant.
-
Feb 2005
Remove/replace bathroom door on each room.minor sheetrock work.relocate existingelectrical outlets.
-
Apr 2005
Remodel of interior lobbby, restaurant, bar, mtg rooms, ballrooms and associated with the hotel. work.
-
May 2005
Enclose 27 floors, balcony, provide accessibility ramp and accessibility door, reduce the front door.
-
May 2005
Remove non structual interior finish per plan. interior soft demolition on 1st, 2nd, 3rd, mezz, 5th fl.
-
Jun 2005
Provide tenant improvement per plan for 1st, 2nd and basement floor including partition walls.
-
Jun 2005
Upgrade existing kitchen equipment per plan.
-
Jun 2005
Provide mechanical, electrical, plumbing per plan for floors 1-5 & basement.
-
Jun 2005
Provide t.i per plan for 3rd fl and mezzanine. and to correct nov#200342811. including new partition.
-
Dec 2005
Revision to permit application 2005/02/04/4896. reconfiguration rooms on 5th floor to 27th floor per plan. m & e under separate permit.
-
Jul 2011
Demolish 1 guest room on floor 26 and combine with conceige lounge close off one hour door & modify other doors on hallway. construct new walls cabinets and counter tops, install built in banquette seating & cabinets, electrical, plumbing and sprinklers under seperate permit.
-
Dec 2013
Ground floor - demolish existing spa area on ground floor. install new walls, ceilings, lighting and cabinetry. electrical, plumbing and sprinkler modifications will be performed under separate permits. ** maher: compliance with ordinance no# 155-13 not required **.
-
May 2016
Install new aluminum tracks on the north, west and south elevation exteriors to provide stability anchors for window washing equiptment.
-
Dec 2017
5/f: minor non-structural demolition, drywall, doors, frames and hardware, plmg fixtures reinstalled into previous locations. n/a for maher.
-
May 2018
Install track system on facade of building and davit systems/equipments at roof to secure window washing equipment and light exterior maintenance.
-
Feb 2019
Non structural interior demolition, drywell, doors, frames & hardware, plumbing fixtures reinstaled into previous location, finishes, create 2 model rooms on 23rd fl & 25th fl.(2 units only).
-
Mar 2026
Removal of kearny street pedestrian bridge that connects sq ft rec and park property to hilton hotel.
DBI holds 133 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 133. 11 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants and the date of the last recorded sale. The city's Modern & Postmodern styles context statement dates this building 1971; the assessor's roll records it as built 1970. Submit an update