Permit history
-
Mar 1987
Structural seismic upgrading only.
-
Jan 1988
Architectural, mechanical, electrical, re #8703506, 8712724, 8700803.
-
Oct 1988
Install wet sprklr & dry standpipe systems.
-
Jan 1989
Finishes of retail space incl. drywall, electrical, hvac, sprklr.
-
Feb 1989
Dry wall, acoustical, sprinkler, electrical, paint fixtures.
-
Feb 1989
Dry wall, acoustical, sprinkler, electrical, paint fixtures.
-
Feb 1989
Drywall repair, sprklr, hvac, electrical, superseded #8901149.
-
Apr 1989
Drywall partitions, millwork, shewing bracing, wall, floor.
-
Mar 1990
Basement interior non structural partitions.
-
Sep 1990
T/i remodel on 1/f retail space interior partitions.
-
Apr 1992
Interior tenant improvements (non-structural).
-
Jun 2006
Renovate existing facade of building. exterior work only. sprinkler work under separate permit.
-
Mar 2007
Revision to approved app #200604280200 as built permit. minor changes to locations of walls and doors due to site conditions. as built.
-
Apr 2010
Construction of a closure wall to enable abandonement of approx 1400 sq ft of existing building area located in the basement beneath the sidewalk and outside the property line. no change in use. tenant improvements under seperate permit.
-
Nov 2021
Change of use retail to office (37, 402 sq ft). new office entrance and service entry. new elevators, elevator lobbies, and basement level bicycle commuter facility. replacement of existing mep systems, screening and new roof system. selective interior demolition to accomodate new use.
-
Feb 2022
Selective interior non structural demolition per ab-017 ref permit application 202202228420 sprinklers to upright.
-
Feb 2022
Fire sprinkler permit" provide upright sprinkler protection on lower level 6 for demolition of existing partition and ceilings plug off remove existing sprinkler drops.
-
Sep 2022
Provide upright sprinkler protection for core & shell conditions @ demolished walls & ceilings. provide pendent sprinklers @ new ceilings @ new restrooms & elevator vestibules. total sprinklers in project: 403. extend existing fdc on o'farrell st for new stucco wall finish.
-
Sep 2022
Provide a new fire alarm system and a new 2-way communication system. ref t.i. permit application 202111082012.
-
Oct 2022
Design & install an emergency radio responder coverage system in accordance with sffd ab#2.01-2019 addendum g. ref permit application 202111082012.
-
Nov 2022
4/f: construction new non structural partitions, new operable partitions, new accoustical grid and tile and gyp bd ceilings, new finishes throughout. pantry millwork, equipment, and plumbing fixtures also included. mep and life safety deferred submittals.
-
Jul 2026
6th floor: build out for offices. existing services and access for the floor, including restrooms, elevators, and exit stairs will all remain in place. 2 break areas will be provided in the space.
-
Aug 2026
3rd floor: an existing vacant 3rd floor to be built-out as a multi-tenant office floor. existing serving and access for the floor including restrooms, elevators and exit stairs will all remain in place, break areas will be provided in each tenant space.
-
Aug 2026
An existing vacant 5th fl. is to be built out as an office floor. existing services and acess to the floor including restrooms, elevators and exit stairs, will all remain in place. a break area will be provided. an existing communcating stair to the sixth floor will remain in place.
DBI holds 88 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 88. 8 of them are nominal $1 street-space or sidewalk permits.