222 Second Street
East Cut · San Francisco, CA 94105
Public art
- Riallaro — Frank Stella
Pixel painting on canvas; building lobby; artwork is accessible during normal business hours, when POPOS is open, 8-6.
Installed 1997. - The Pequod Meets the Delight — Frank Stella
Mixed media on honeycomb aluminum; building lobby; artwork is accessible during normal business hours, when POPOS is open, 8-6.
Installed 1992. The city's inventory titles it “Shards”. - Shards III — Frank Stella
Pixel painting; building lobby; artwork is accessible during normal business hours, when POPOS is open, 8-6.
Installed 1983. The city's inventory titles it “The Pequod Meets the Delight”.
Permit history
-
Apr 1990
Erect a fourteen story office structure.
-
Nov 2007
Construction of 26 stories, 2 basements, office building with public assembly, food/beverage handling, retail sales, parking.
-
May 2013
Excavation shoring for new construction on the same address 222 2nd street. (reference permit application 200711309386s).
-
May 2015
Full floor tenant improvement 5th fl. partitions, ceiling, lights, mep.
-
Jun 2015
6th floor ti consisting of ceilings, partitions, furniture, finishes, lighting fixtures, mechaniical, plumbing, electrical, selective structural reinforcement. life safety deferred.
-
Jun 2015
T.i. including ceiling, partitions, furniture, finishes, lighting fixtures, mechanical, plumbing, electrical, fire alarms, selective structural reinforcements. fire sprinklers deferred. n/a ordinance #155-13.
-
Jun 2015
7th flor t.i.: consisting of ceilings, partitions, furniture, finishes, lighting, fixtures, mechanical, plumbing, electrical, selective structural reinforcements. fire alarm, spklrs, sep permits.
-
Jul 2015
Ti partitions, lighting, mep and minor structural.
-
Jul 2015
9th floor commercial t.i. on plumbing, selective structural reinforcment. n/a for maher. life safety deferred.
-
Jul 2015
10th floor commercial t.i. partitions, fixtures, mechanical, electrical, plmg, selective structual reinforment. n.a for the maher. life safety deferred.
-
Jul 2015
11th floor t.i.: partitions, lighting, mep, structural reinforcing life safety sep permits.
-
Jul 2015
12th floor t.i.: partitions, lighting, mep, structural reinforcing life safety sep permits.
-
Aug 2015
3rd floor: t.i. for kitchen, dining and restroom facilities consisting of: partitions, ceilings, lighting fixtures, mechanical, electrical & plumbing, maher n/a.
-
Aug 2015
2nd floor: commercial t.i. including partitions, ceilings, finishes, plumbing, mechanical, electrical & structural; maher n/a.
-
Aug 2015
14th floor: ti - including partitions, ceiling, lighting, fictures, mechanical, plumbing electrical.maher na.
-
Aug 2015
13th floor: ti - including partitions, ceiling, lighting, fictures, mechanical, plumbing electrical.maher na.
-
Sep 2015
17th floor: full floor leed comm. t.i. for office, food serving and dining facilities consisting of partitions, ceilings, lighting fixutres, mechanical, electrical and plumbing. n/a for maher.
-
Jan 2016
15th floor: : full interior tenant improvement including mep's; maher n/a.
-
Jan 2016
16th floor, complete interior ti including mep's.
-
Jun 2019
24th floor. partial floor t.i with new partions, ceilings, finishes, millwork, furniture, lighting, plumbing, mechanical and electrical incl employee cafeteria with limited prep with mostly pre-packaged food. some prep such as loose dry goods, perishable packaged goods, self-serve drinks.
-
Nov 2019
24/f: partial t.i. for new video production studio; new raised floor system, partitions, ceiling lighting, finishes, plumbing & mecahnical; structural includes lighting grid support, floor system & accoustical glazing.
-
Jun 2020
18/f: partial tenant improvement including new partitions, ceilings, finishes, millwork, furniture, lighting, mechanical, electrical, plumbing including new catering support room with limited food prep. no structural scope of work.
-
Jan 2022
18/f: interior t.i., selective demolition & construction of non-load bearing partitions, doors, frames, new ceiling grid & tile, new finishes.
-
Feb 2025
13/fl- -ti work includes new interior partitions, doors, finishes, ceilings and associated mep.
DBI holds 230 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 230. 4 of them are nominal $1 street-space or sidewalk permits.
Buying the requirement
Rather than commission a work, the developer bought three existing Frank Stella paintings for $1 million to satisfy the city's 1% art requirement. They hang in a ground-floor room of teak walls and polished concrete that opens onto Howard Street through 22-foot portals. Stella (1936–2024) was an American painter, sculptor and printmaker.
The city's inventory titles one of them “Shards”; a published catalogue of the room gives Shards III, of 1983.
Not yet documented: the developer and the early tenants. Submit an update