299 Second Street
East Cut · San Francisco, CA 94105
Public art
- Globe — Topher Delaney
Bronze; courtyard; accessible 8:00 a.m. to 6:00 p.m.
The bronze sculpture stands in the ground-floor courtyard and can be seen through the lobby window when the courtyard is closed.
Permit history
-
Aug 1983
New construction.
-
Dec 1998
To erect 414 dwelling restaurant parking.
-
Jun 1999
Shoring.
-
May 2000
Automatic sprinkler & standpipe system, electric & diesel fire pump.
-
Aug 2000
Install swimming pool.
-
Apr 2001
Provide equipment plan.
-
Oct 2002
Fire alarm for courtyard. connect to existing system.
-
Nov 2002
New counters for existingrestaurant, new ada counter for existingrestaurant.
-
Mar 2003
New counter for new restaurant new ada counter for new restaurant, concept lighting layout only. equ.
-
Feb 2005
Remodel of 870 sq ft of existing coffee shop on the ground floor for a new starbucks coffee shop.
-
Aug 2006
Scope of work at ground floor.: relocate and add doors to existing library. install new wood floor and new carpet. patch fire place flue, new fountain and casework. mep under sep permit.
-
Sep 2011
Installation of 5 at&t equipment cabinets in a fenced compound in existing basement parking garage parking garage of existing building.
-
Feb 2014
Remodel of existing fitness center on 2/f of hotel. compliance ordinance #155-13 not required.
-
Oct 2016
Renovatation of 15 ada rooms on floors 3-18. converting 3 ada guestrooms to standard guestrooms & 1 guest suite to an ada guest suite. commercial ti. ** maher: n/a **.
-
Dec 2016
Demolition only for hotel improvement project to include removal of fixtures finishes guest rooms bath and corridors. demolition only not for occupancy. base building permit 201610311498.
-
May 2017
Relocate fire sprinklers on 6th to 14th floor (bathroom entry). ref pa 2016-1031-1498. maher na (50 sprinklers per floor total 400).
-
Jun 2018
Selective remodel of exterior, new exterior finishes on ground and second fl, new exterior paint throught, expanding lobby at ground fl, interior renovation renovation at ground fl public spaces and 2nd fl fitness room.
-
Dec 2018
Ground & 2nd floor - selective remodel of exterior, new interior finishes. expand lobby at ground floor, partial infill of existing port-cochere, new exterior covered outdoor space, interior renovation of ground floor public spaces, basement parking restriping. ** maher: n/a **.
-
Jan 2019
Selective demolition of 1st & 2nd fl, interior and exterior selective demolition of existing porte cochere, public open space at folsom and courtyard public open space. demolition of roof trellis. associated with bpa #201812148389.
-
May 2019
Modify existing sprinkler system due to new walls and ceiling ti. grnd floor - demolition 10, add 24 and relocate 99. 2nd floor add 10, relocate 44.
-
May 2019
Ref permit application 201812148389. cold metal framing; exterior metal stud framing. install all exterior metal stud framing system as required.
-
Jun 2019
1st and 2nd floor: modification to fire alarm and add 5 control relays, 4 smoke detectors and 1 duct detector. change 39 sprinkler/strobes.for maher. ref app#201812148389.
-
Apr 2021
Removal of existing specific pieces of laundry euipment. reconfiguration of storage and employee area addition of office spaces (2) exterior wall louvers to be demolished and replaced with new wall to match existing.
-
Apr 2022
Expansion of existing fitness center, including new fitness equipment, flor, wall & ceiling finishes. infill existing indoor pool & spa & convert space into a meeting room. expansion of existing outdoor patio on 2nd fl. new bi-folding door & storefront at deck.
DBI holds 91 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 91. 19 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants, when each artwork was installed and who designed the open space. Submit an update