572–576 Folsom Street
East Cut · San Francisco, CA 94105
-
1912
Built as the J.E. Bier Building.
-
May 1989
Parapet work.
-
Jul 1998
Install structural components strengthen existingstructure.
-
Jun 1999
Provide underpinning per plans.
-
Aug 1999
Mmi 1 2nd floor el me l/s sp.
-
Aug 1999
Mmi 3rd floor, el & me.
-
Aug 1999
Mmi el me 1/f.
-
Oct 1999
Install concrete basement fire sprinkler system offices.
-
Oct 1999
Mm1-2 el me.
-
Oct 1999
Mmi-2 el me.
-
Oct 1999
Oti-2 el me only.
-
Jan 2000
To erect nonelectrical sign.
-
Mar 2000
Install 1st floor fire sprinkler system.
-
Mar 2000
Mmi basement, el, me & sp.
-
Mar 2000
Added clarification notes on arch. plans re: sprinkling of 1st floor.
-
May 2001
Construct portion of walls from existing 8'-0" height to full height of structure, add acoustic glazing r.
-
Oct 2002
Oti-1 1st floor - no oti-2.
-
May 2008
Addition of non-load bearing interior partitions on 1st & 3rd floors. new interior finishes, carpet (flooring), soft demolition on 1st & 3rd floors, architectural only. mechanical/electrical and lifte safety work will be under separate permit.
-
Apr 2017
Existing elevators control panels and fl. id signage. relocation & configuration of coffee stations & kitchenette. reconf. enlargement of existing toilets-2nd & 3rd fl. new accessibilty toilet & shower at basement level. new private offices & phone booths. no exterior work.
-
Aug 2020
Reroofing - furnish and install new cool roof modified bitumen cap sheet. johns manville appex 4.5 cr g.
-
Aug 2020
Repair and maintenance. not visible from the street. furnish and install new cool roof modified bitumen cap sheet.
3 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update