601–611 Folsom Street
Office building
-
Apr 1990
Drywall ceiling & reinstall surface mounted lights.
-
Aug 1996
Hvac project--install exhaust system, reinforcing wall open'g.
-
Mar 2000
Battery room, and closing of battery rm @ 2nd floor.
-
Feb 2001
Install hvac, chilled water piping & new power feeds (1st floor).
-
Feb 2004
Replacement of chillers located in basement/rplmnt of 2 chilled water pumps.
-
Oct 2005
Retro fitting existing building with new fire protection systems. basement to roof with new class ii stand pipe for hose stations. sprinkler per highrise ordinace phase ii-phase i separate permit.
-
Nov 2007
Repair/replace existing insulation in vertical air supply plenum on all floors of building/ encapsulate insulation with 22gauge sheet metal from basement to 9th floor, install new code compliant access doors for duct work on all floors.
-
Oct 2009
Replacement of a supply fan, sq ft-6, to the ninth. floor air handler.
-
Jan 2013
Install new roof top air handler and duct work.
-
Jan 2016
2nd floor: at&t- install 2 in-row cooling units one is redundant; maher n/a separate permit deferred for 4" sprinkler pipe relocation.
-
Apr 2018
9th floor: install a pair of crac units and replace a chiller in the basement. n/a for maher.
-
Dec 2018
Install 2 new computer room air handlers on the 3rd fl.
-
Aug 2021
Replace 1 water cooled ac unit on the 6th floor with 2 new chilled water ac units on 6th floor. remove 2 existing closed circuit cooling towers on the roof. remove all condenser water piping, supports, and electrical feeders on the roof for the removed cooling towers. we are not moving any existing walls.
-
Feb 2023
Install mechanical and electrical infrastructure to support telephone equipment.
-
Mar 2023
Reroofing.
-
Aug 2024
Secure vertically oriented/long alumium panels across all elevations of the building. this is a preventive measure. a full facade study is also planned in august 2024 to observe and meet with city's facade inspection requirement.
DBI holds 150 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 150. 4 of them are nominal $1 street-space or sidewalk permits. 9 expired permits are not shown.
Room 641A
The building is one of AT&T's principal telephone-switching sites in San Francisco. In 2006 a former technician disclosed that Room 641A held equipment splitting AT&T's fibre-optic backbone traffic to the National Security Agency.
Nearby
- 572–576 Folsom Street Same street
- 608 Folsom Street Same street
- 350 Second Street Same block
- 600–620 Harrison Street Same block
- 120 Hawthorne Street Same block
- 126 Hawthorne Street Same block
- 282 Second Street Around the corner
- 303–353 Second Street Around the corner