600–620 Harrison Street
East Cut · San Francisco, CA 94107
Permit history
-
Oct 1985
Alteration to site permit 8109003s.
-
Aug 1990
Build out of two floors for general office use.
-
Oct 1990
Tenant improvement office on floor 5 & 6.
-
Dec 1991
Tenant improvement.
-
Apr 2000
Oti-1 el me ls sp 2nd floor.
-
Aug 2003
Oti-1 4th floor, no oti-2.
-
Sep 2003
Oti-2 4th fl-el, me.
-
Oct 2003
Oti-1 at 6th fl.
-
Oct 2003
Oti-1, 5th fl, el, me, ls, sp.
-
Mar 2004
Oti-3 6/f el me.
-
Mar 2004
Oti-3 5/f el me.
-
Jun 2004
Oti-1 3rd floor -el, me, ls, sp.
-
Jun 2004
Oti-1 2nd floor -el, me, ls, sp.
-
Apr 2011
#600 - demolition and construction of non load bearing partitions, millwork and finishes. mechanical, electrical, plumbing sep permit.
-
Oct 2011
Office ti on the 5th floor. full floor. selective demolition, partition wallas, electrical, mechanical, plumbing, ceiling, finishes. sprinkler/fa/life safety shall be under separate permits. 2 showers, ups with batteries greater than 50 gal.
-
Jul 2014
Interior tenant improvement. no core shell or structural work. existing accessible path or travel and restrooms to remain. demolition on sep permit. construction of non structural partitions and finishes fls fire alarm under separate permit. compliance with ord 155-13 not required.
-
Sep 2015
3rd floor; ti - open office, internal meeting rooms and breakroom. mep under deffered submittal. maher na.
-
Oct 2015
3rd floor: ti - mechanical & electrical. new terminal vrv heeating duct work ref pa 2015 0908 6389 maher na.
-
Nov 2015
Full floor ti includes demolition and new interior construction. mep and life safety/sprinkler under separate permit.
-
Jan 2016
Accessible path of travel upgrade at front entry, new lobby finishes, and lighting. new elevator cab finishes, new ceiling and lighting. new glazing and finishes at entry. mechanical, electrical., plmg under seperate permit. n/a for maher.
-
Feb 2016
4th floor - mechanical and electrical work for ti ref pa 2015-1125-3649. maher na.
-
Apr 2016
4th floor: 36, 895 sq ft new full floor tenant improvement to include demolition & construction of non-load bearing walls, new clg grnd & tile, light fixtures, millwork & finishes. mep & fire/life safety under separate permit.ref. 201611253649; maher n/a.
-
Jun 2017
2nd floor: demolition and construction of new walls, doors, millwork, ceilings, and finishes. mep, life safty, fire sprinklers and evacuation mapping on seperate permit. n/a for maher.
-
Nov 2017
#600-t.i. to include demising full floor tenant into 2 suites, selective demolition & construct non load bearing partitions, modify existing ceiling grid, tile, new light fixtures, new office doors & frames, salvage & reuse of existing selected materials, new millwork, sink & new finishes. na maher.
-
Mar 2022
Ste #600: tenant improvement. removal of non-structural partitions, ceiling assembly & light fixtures. new non-structural partitions, finishes, light fixtures. fire life safety & sprinkler under separate permit.
DBI holds 235 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 235.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update