642 Harrison Street
East Cut · San Francisco, CA 94107
Permit history
-
Jan 1982
Additions alterations or repairs.
-
Oct 1984
Existing fire sprinkler system to be revised.
-
Feb 1985
Additions alterations or repairs.
-
Jul 1985
Computer flooring, hvac-ups, halon system, power distributio.
-
Nov 1985
Tenant improvement.
-
Feb 1987
Tenant improvements, non bearing partitions, hvac, finishes.
-
Oct 1990
Underpinning & shoring epr plans ref #9006415-s.
-
Jun 1996
Cti-1 2/f el me sp.
-
Jul 1996
Cti-3 5/f el sp.
-
Jun 1999
Demolition of existing office walls t-bar ceilings & flooring space.
-
Feb 2000
Oti-1 el me ls sp ground floor.
-
May 2000
Oti-1, 3rd floor, el, me, ls, sp.
-
Aug 2004
New 1st floor parking garage in existing 4 story concrete type 1 building. with existingb occupancy @ 1st floor.
-
Dec 2004
Conversion of existing office building to include 43 resid'l units with parking and vertical addition of 2 stories.
-
Jul 2008
Interior tenant improvement on 2nd floor, no structural or exterior improvements; all plumbing and/or electrical for new shower performed under separate eprmit. work includes installation of new non-bearing walls & alteration of existing non-bearing walls.
-
Mar 2010
4th floor-tenant improvement-interior construction includes demolition & construction of non bearing non rated & 1 hour rated partitions. also includes electrical, mechanical, plumbing. fire sprinklers and fire alarm on separate permit.
-
May 2010
Install a new cooling tower for the hvac system on the roof. architectural work, remove existing tower.
-
Aug 2010
Office ti on the 3rd floor including new partitions, rated assemblies and code required. mep and life safety measures under separate permit.
-
Sep 2010
Mechanical and electrical permit. architectural ti under permit application 2010.08.03.8021 for reference.
-
Oct 2010
Tenant improvment including new non load bearing walls, doors, glaz, ceiling grid, lighting, casework, finsihes. electrical, mechanical, plumbing under separate permit.
-
Nov 2010
(mep) for permit application 201010293995, 1st floor. lighting switching, receptacles, duct work alterations, add 2 sinks.
-
Sep 2012
Reroofing.
-
Jan 2015
Ste #200. addition of 3 small private offices, paint, reception flooring & finish refresh. mep deferred. n/a for maher.
-
Mar 2025
Comply to nov202535387. convert existing exterior window to new roll up door. new guardrail. replace counter @ kitchen, reinstall sink. all work on 4/f.
DBI holds 101 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 101. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update