400 Second Street
East Cut · San Francisco, CA 94107
Permit history
-
May 1984
Interior reconstruction, drywall, electrical, plumbing.
-
Jul 1984
Interior office construction in existing buildingn.
-
Mar 1988
Add partitions, lights, paint, carpet.
-
Aug 1988
Relocate partitions, ass partitons, outlets.
-
Feb 1991
Cti-1.
-
Sep 1991
Cti-1 install broadcast studio.
-
Dec 1991
Cti ii floor 3rd el, me, sp.
-
May 1992
Cti-1 fl bsmt (el me sp).
-
Aug 1992
Cti-1.
-
Jun 1994
Cti-1 4th el me sp.
-
Sep 1994
Cti-1 2nd fl, el, me, sp.
-
Oct 1994
Cti 2 floor 2nd el me sp.
-
Nov 1997
Install new inter connecting steel stair recept lvl to lower.
-
Jun 1998
Reroofing.
-
Dec 2000
Oti-1: 3rd floor only = el, me. ls, sp.
-
Jan 2011
2nd floor-office t.i: minor demolition of non structural partitions, minor amount of new partitions with restrooms upgrades. m.e.p is design build under seperate permit. spinkler under seperate permit.
-
Oct 2012
3rd floor: office tenant improvement: minor demolition of non structural partitions. new partitions and millwork. new lighting. m e p on seperate permit. sprinklers on seperate permit.
-
Jul 2013
Ste #450: office t.i. for minor demolition of non structural partitions, new partitions and millwork with relocation of light fixtures. mep under seperate permit. sprinkler and life safety under seperate.
-
Apr 2014
Office tenant improvement: minor demolition of non structural partition new partitions, millwork and adjusted lighting, mep & life safety on separate permits. compliance with ord 155-13 not required.
-
May 2015
4th floor: demolition of non-structural partitions. new non-structural paritions, existing ceiling with minor light fixture adjustment and nw millwork. design build electrical and mechanical. rebalance defered submital. life safety and fire sprinkler under separate permit. maher n/a.
-
Jul 2015
B/f - demolition of non-structural partitions, new non-structural partitoins, lighting, powr, finishes and millwo5rk. design-build mep by general contractor and deferred structural life safety and sprinkler under separate permit.
-
Sep 2015
Basement: mechanical and electrical for work done under app# 201507080943. n/a for maher.
-
Sep 2016
Lobby: demolition of non structural partitions, ceiling patch and repair gyp/ new lights, additional power & finishes. mep/fire/life saftey under sep permit.
-
Dec 2019
To erect 27 stories, 3 basements, type i-a, office, pdr, retail building. (b, m, a-3, s-2).
-
Apr 2023
To demolish 4 story, office building.
DBI holds 116 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 116. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update