71–99 2nd Street
East Cut · San Francisco, CA 94105
-
1898
Built as the Wells Fargo Building, and rebuilt in 1907.
-
1907
Restored after the earthquake, one of the few pre-earthquake buildings on the block repaired rather than replaced.
-
Mar 1984
Additions alterations or repairs.
-
Mar 1993
Seismic upgrade entire building. foundation & superstructure.
-
May 1995
Building upgrade, sprinkle, new toilet rm, hp ramp access, mechanical sys.
-
Oct 1995
Fire sprinkler system.
-
Feb 1996
Cti i 3rd floor el-me-sp.
-
Feb 1996
Cti i 4th floor el-me-sp.
-
Feb 1996
Cti i 2nd floor el-me-sp.
-
Aug 1996
Cti-1 8/f el me sp.
-
Aug 1996
Cti-1 (el me sp) 6th fl.
-
Aug 1996
Cti-2 (el me) 6th fl.
-
Aug 1996
Cti-1 floor 5th el me sp.
-
Sep 1996
Cti-2 5/f el me.
-
May 1997
Cti-1 1/f el me sp.
-
Oct 2011
Tenant improvement - 2nd, 3rd and 4th floor. non-structural. electrical, mechannical and life safety under separate permit.
-
Jul 2012
T.i. on a multi-tenant ground floor, new partitions, demolition millwork and interior partitions. minor relocation of lighting, new doors and glazing. mep under seperate permit.
-
Mar 2013
Suite 700: new t.i. to include doors, partitions, ceiling and millwork. m.e.p. is included in this permit.
-
Jul 2016
2nd floor ti - some demolition, new non-load bearing interior partitions, glazing, ceiling & power/datra work and new finishes; mep, life safety & sprinkler under separate permit. n/a ordinance #155-13.
-
Jul 2016
3rd floor ti - some demolition, new non-load bearing interior partitions, glazing, ceiling & power/datra work and new finishes; mep, life safety & sprinkler under separate permit. constr cost shown excludes mep. n/a ordinance #155-13.
-
Jul 2016
1st floor ti - include new non-load bearing interior partitions (some demolition), glazing, ceiling & power/datra work and new finishes; mep, life safety & sprinkler under separate permit. n/a ordinance #155-13.
-
Aug 2016
Remove existing hot water fan coils & assoc. duct. install new water source heat pumps & assoc. duct new condenser water piping. floor 1-3.
-
May 2017
4th fl - new interior partitions, glazing, ceiling, power/data work, new finishes, and restroom upgrades. life safety & sprinkler system modifications, structural for garage door and wood panel wd1 are under separate permit. no exterior building, site, landscape, use or parking changes are proposed.
-
May 2017
5th fl - construction of new non-load bearing interior partitions, glazing, ceiling and power/data work and new finishes. life safety and sprinkler system modification are to be under a separate permit. no exterior building site, landscape use or parking changes are proposed. the suite is currently.
-
Nov 2021
1st fl, tenant improvement - expansion of existing furniture showroom into adjacent tenant space. work include new partitions, door millwork, lighting, electrical and finishes; no exterior work; mep, fire sprinklers & life safety under separate permits.
-
Apr 2026
2nd & 3rd fl - ti includes demolition of non-structural partitions and building new non-structural partitions. all new meps and life safety work will be design build and submitted for permit separately (building is fully sprinklered) ref permit application 202603278389.
-
Apr 2026
1st fl/level 1 ti includes demolition of non-structural partitions and building new non structural partitions. all new or revised meps and life safety work will be design build and submitted for permits separately (building is fully sprinklered) ref permit application 202603278392.
DBI holds 175 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 175.
The report dates this building to 1898 in its inventory table and to 1902 in its narrative. Not yet documented: the architect and builder and the early tenants. Submit an update