50–80 Beale Street
East Cut · San Francisco, CA 94105
-
1967
Built as the Bechtel Building, the first office tower of the central business district to cross south of Market Street.
-
Apr 1979
Created during job card conversion on: 03/04/83.
-
Apr 2008
Interior ti on the 23rd floor including demolition, new drywall, ceiling work, doors, glazing, millwork, finishes, new lighting, new vav boxes, ductwork, exhaust fans and dampers, and large pantry area. fire sprinklers and life safety under separate permit.
-
May 2008
19th floor: interior demolition & remodel including new carpets, lights, paints & millwork & less building core areas & egress stairwells. mechanical & electrical work including ductwork, van boxes, distribution, lighting, power & date. life safety under separate permit.
-
Nov 2014
Interior tenant improvements to 12th floor including demolition and construction of partitions, new floor and wall finishes, replace ceiling and lighting throughout.
-
Nov 2014
Interior tenant improvement to 13th fl including demolition and construction of partitions, new floor and wall finishes. replace existing ceiling and lighting througout maher not req.
-
Jun 2015
11th floor: ti to include new open office space, conference room, break area, phone room, storage & room, mep & l/s under separate permit; maher n/a.
-
Dec 2017
7th floor: ti - construct partitions, doors, millwork & finishes and mep. fire alarm & sprinklers under sep permit maher na.
-
Mar 2018
8th floor - minor demolition and accessibility upgrades in restrooms, additions include non structural partitions, ceilings, light fixtures, electrical/plumbing, millwork & finishes. n/a for maher.
-
Jul 2018
9th floor- light demolition. int ti - new wall construction, lighting, finishes. restrooms, ada accessibility upgrades.
-
Sep 2018
Interior tenant improvement lobby remodel, including all new finishes & lighting. no structural. no exterior work. maher na.
-
Oct 2018
Tenant improvement to include new non-structural partitions. mep & fire life safety under separate permit.
-
Mar 2019
Ti of 3rd fl: construction of new meeting rooms, pantry & gender neutral restrooms. mep/fire under sep permit. maher na.
-
Nov 2019
Ti on 23rd fl to consist of new non-structural partitions. mep & fire life safety under separate permit.
-
Nov 2019
21st fl - ti, single tenant floor, building new non-structural partitions: (mep, life safety & sprinkler under separate permit if needed). building fully sprinklered.
-
Nov 2019
20th fl - ti, single tenant floor, building new non-structural partitions: (mep, life safety & sprinkler under separate permit if needed). building fully sprinklered.
-
Nov 2019
22nd fl - ti, single tenant floor, building new non-structural partitions: (mep, life safety & sprinkler under separate permit if needed). building fully sprinklered.
-
Dec 2019
14th floor: office ti. changing 4 offices into 2 conference room. demolition interior underpinned partition. mep included.
-
Mar 2020
16/f: construction of conference spaces, collaboration space. all alteration interior only. existing service core elecments including stairs, elevators & mep shafts to remain, fire left safety under sep permit. maher n/a.
-
May 2020
17/f: construction of conference spaces, collaboration space, break room. all alteration interior only. existing service core elements including stairs, elevators & mep shafts to remain, fire life safety under sep permit. maher n/a.
-
Feb 2021
18th floor: t.i. construction of conference space, collaboration space and break room. interior only. all alterations are interior only. existing service core elements to remain the same elevator/mep shaft. fire life safty seperate permit.
-
Feb 2021
19th fl: tenant improvement to construct conference spaces, collab spaces & break room. upgrade finishes only. all interior. existing service core element to remain. mep, fire safety under separate permit.
-
Mar 2023
Minor modifications to the offices of a single tenant spread across 3 fls. level 21, 22, 23. totaling approx 8600 sq ft. including demolition of partitions and removal of finishes, build back of 24 new offices and 2-3 new conference rooms.
-
Apr 2025
15/f: interior ti including multi-use men and women restrooms, new partitions, finsihes, light fixutres, ceiling assemblies, millwork, and plumbing fixtures. mep and fire life safety under separate permit.
-
Dec 2025
6th fl: tenant improvement. selective interior demolition and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings & lighting. restroom upgrades are included. no exterior work. pot approved under separate permit.
-
May 2026
14 fl: interior tenant improvement which includes multi-use men and women restrooms, new partitions, finishes, light fixtures, ceiling, assembly, millwork and plumbing fixtures. mep deferred.
DBI holds 805 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 805. 15 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants and who designed the open space. Submit an update