Butler Building

215 Fremont Street

  • Office building
  • 8 stories
  • 385,558 ft2
  • 53,803 ft2 lot area
  • 157 rooms
  • 24 bathrooms
  • Zoned C3OSD
  • Sold February 1, 2019
37.7889, −122.3946 Street View appears here once a Google Maps embed key is configured.

Public art

  1. 1928

    The Del Monte Building was built — an office building of about 109 feet, which the Del Monte Corporation held until 1973.

    315 Howard Street Office Building DEIR, SF Dept. of City Planning, 1980
  2. 1976

    Continental Development Corporation, which had bought the building from Del Monte in 1973, put it through major restoration and renovation work in 1976 and 1977 rather than demolish it — a decision the company's own environmental report describes as the reason it acquired the property.

    315 Howard Street Office Building DEIR, SF Dept. of City Planning, 1980
  3. Feb 1982

    Otc alterations permit.

  4. Nov 1999
    Permit 9924190S $$$ $1,500,000

    Vertical addition.

  5. Jul 2000
    Permit 200007014218 $$$ $250,000

    Revision #9924190 add approx 24000 sq ft in between 7th & 8th floor to make this a 9 story building.

  6. Oct 2000
    Permit 200010193508 $$$ $1,200,000

    Oti-1 3/f el me ls sp.

  7. Mar 2001
    Issued Permit 200103053435 $$$ $1,200,000

    Oti-1 5th floor, ltg, mechanical, ls, spr.

  8. Mar 2001
    Issued Permit 200103053432 $$$ $1,200,000

    Oti-1 6thfl, ltg, mechanical, ls, spr.

  9. Mar 2001
    Issued Permit 200103053428 $$$ $1,200,000

    Oti-1, 4th floor, ltg, mechanical, ls, spr.

  10. May 2001
    Issued Permit M16123 $$$ $1,200,000

    Stret space.

  11. Jun 2001
    Permit 200106292660 $$$ $3,500,000

    Minor demolition of drywall partitions, new conf rm; dev. of 9th floor terraces; chg use fr b to a-3.

  12. Jul 2001
    Permit 200107274667 $$$ $1,800,000

    Oti-7 7th fl ltg mechanical ls spr.

  13. Aug 2001
    Issued Permit M16891 $$$ $1,200,000

    Street space.

  14. Nov 2001
    Issued Permit M17863 $$$ $1,200,000

    Street space.

  15. Mar 2002
    Issued Permit M19475 $$$ $1,200,000

    Stree space use /sidewalk permit.

  16. May 2017
    Permit 201705035572 $$$ $3,000,000

    6/f- interior demolition of non-structural elements including but not limited to partition, doors, lighting and ceiling. construct of new offices, conference, break area and new finish. life safety, fire alarm and sprinkler are under separate permit. n/a ordinance #155-13 incuding mep.

  17. May 2017
    Permit 201705247575 $$$ $5,000,000

    Interior demolition of non structural element including but not limited to partiton, doors, lighting, ceiling. construction of new offices, conf room, break rms, finishes, mechanical, electrical, plumbing, ls, fire alarm, sprnkler plans sep permit.

  18. Oct 2018
    Issued Permit 201810123022 $$$ $2,500,000

    5th floor: commercial t.i. to include new private offices and upgrade to existing offices, conference rooms, break area, and new led throughout. n/a for maher.

  19. May 2019
    Permit 201905100297 $$$ $900,000

    2nd fl: limited demolition of existing partitions, finishes, ceilings & light fixtures. new partitions, finishes, ceilings & light fixtures for offices, conference rooms, and partries. micro kitchen under separate permits. basement modification.

  20. Oct 2019
    Permit 201910316130 $$$ $1,500,000

    8th floor: mep drawings to support approved arch. set for employee cafeteria. demolition of ductwork and equipment. install new ductwork and equipment. ref app#201907226536.

  21. Jan 2021
    Permit 202101273406 $$$ $10,000,000

    Level 6 t.i: update lobby, core/shell restrooms, conference rooms, library and micro kitchen. demolition under separate permit.

  22. Jan 2021
    Permit 202101273412 $$$ $7,000,000

    Level 8 t.i: includeds fitness area locker rooms, restrooms and cafe, bolt kitchen/food prep with updates to lobby and corridor.

  23. May 2021
    Permit 202105200701 $$$ $1,704,445

    Ti upgrade core/shell restrooms on levels 2, 3, 4 and 8. work includes demolition, upgraded framing, drywall, tile work, and toilet partitions. upgrade plumbing, electrical and mechanical components. fire sprinkler and fire alarm on deferred submittal.

  24. Oct 2023
    Permit 202310108255 $$$ $2,200,000

    4/f: ti new partition for proj work & utility rms. no change of use. all egress & life safety systems to remain in operation during & after construction. gc to provide temp exit signs/strobes as req by construction. no hazmat used/stored on site in limited qty.

  25. Oct 2023
    Permit 202310108253 $$$ $1,800,000

    3/f: ti new partition for offices, mtg rms, & proj work rms. no change of use. all egress & life safety systems to remain in operation during & after construction. gc to provide temp exit signs/strobes as req by construction. no hazmat used/stored on site.

  26. Dec 2023

    4/f: deferred mep for bpa# 202310108255: add new water source heat pumps; new transfer fans; demolition and reinstall vav reheat and colling boxes as needed.

DBI holds 406 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 406. 8 of them are nominal $1 street-space or sidewalk permits. 1 cancelled permit is not shown. The assessor and a CommercialCafe listing both record 1928; a Structural Engineers Association of California case study on the building's seismic retrofit records 1927.

Ten years empty

The Loma Prieta earthquake of 1989 damaged the building badly enough that it stood vacant for about ten years. A retrofit completed in early 2001 combined steel braced frames with concrete shear walls and took the Structural Engineers Association of California's Excellence in Structural Engineering Award. Gordon Huether's Urban Grit — twelve panels of sandblasted kiln-fused glass, each three feet by four, hung in a 50-foot steel railing across the entrance — was unveiled that July, worked up from his own photographs of cracked pavement and peeling paint.