215 Fremont Street

East Cut · San Francisco, CA 94105

  • Built 1928
  • Office building
  • 8 stories
  • Zoned C3OSD
  • District 6
  • Historic status: unevaluated
37.7889, −122.3946 Street View appears here once a Google Maps embed key is configured.
385,558 sq ftBuilding area
53,803 sq ftLot area
157Rooms · 24 baths

Public art

Permit history

  1. Feb 1982

    Otc alterations permit.

    Complete Permit 8200844
  2. Nov 1999

    Vertical addition.

    Complete Permit 9924190S $$$ $1,500,000
  3. Jul 2000

    Revision #9924190 add approx 24000 sq ft in between 7th & 8th floor to make this a 9 story building.

    Complete Permit 200007014218 $$$ $250,000
  4. Oct 2000

    Oti-1 3/f el me ls sp.

    Complete Permit 200010193508 $$$ $1,200,000
  5. Mar 2001

    Oti-1 5th floor, ltg, mechanical, ls, spr.

    Issued Permit 200103053435 $$$ $1,200,000
  6. Mar 2001

    Oti-1 6thfl, ltg, mechanical, ls, spr.

    Issued Permit 200103053432 $$$ $1,200,000
  7. Mar 2001

    Oti-1, 4th floor, ltg, mechanical, ls, spr.

    Issued Permit 200103053428 $$$ $1,200,000
  8. May 2001

    Stret space.

    Issued Permit M16123 $$$ $1,200,000
  9. Jun 2001

    Minor demolition of drywall partitions, new conf rm; dev. of 9th floor terraces; chg use fr b to a-3.

    Complete Permit 200106292660 $$$ $3,500,000
  10. Jul 2001

    Oti-7 7th fl ltg mechanical ls spr.

    Complete Permit 200107274667 $$$ $1,800,000
  11. Aug 2001

    Street space.

    Issued Permit M16891 $$$ $1,200,000
  12. Nov 2001

    Street space.

    Issued Permit M17863 $$$ $1,200,000
  13. Mar 2002

    Stree space use /sidewalk permit.

    Issued Permit M19475 $$$ $1,200,000
  14. May 2017

    6/f- interior demolition of non-structural elements including but not limited to partition, doors, lighting and ceiling. construct of new offices, conference, break area and new finish. life safety, fire alarm and sprinkler are under separate permit. n/a ordinance #155-13 incuding mep.

    Complete Permit 201705035572 $$$ $3,000,000
  15. May 2017

    Interior demolition of non structural element including but not limited to partiton, doors, lighting, ceiling. construction of new offices, conf room, break rms, finishes, mechanical, electrical, plumbing, ls, fire alarm, sprnkler plans sep permit.

    Complete Permit 201705247575 $$$ $5,000,000
  16. Mar 2018

    Interior demolition and buildout of 5th floor. mechanical, electrical, plmg, life safety, fire alarm and sprinkler modification will be under seperate permit. n/a for maher !!!!!no ceiling demolition peritted!!!!!!.

    Cancelled Permit 201803083186 $$$ $3,000,000
  17. Oct 2018

    5th floor: commercial t.i. to include new private offices and upgrade to existing offices, conference rooms, break area, and new led throughout. n/a for maher.

    Issued Permit 201810123022 $$$ $2,500,000
  18. May 2019

    2nd fl: limited demolition of existing partitions, finishes, ceilings & light fixtures. new partitions, finishes, ceilings & light fixtures for offices, conference rooms, and partries. micro kitchen under separate permits. basement modification.

    Complete Permit 201905100297 $$$ $900,000
  19. Oct 2019

    8th floor: mep drawings to support approved arch. set for employee cafeteria. demolition of ductwork and equipment. install new ductwork and equipment. ref app#201907226536.

    Complete Permit 201910316130 $$$ $1,500,000
  20. Jan 2021

    Level 6 t.i: update lobby, core/shell restrooms, conference rooms, library and micro kitchen. demolition under separate permit.

    Complete Permit 202101273406 $$$ $10,000,000
  21. Jan 2021

    Level 8 t.i: includeds fitness area locker rooms, restrooms and cafe, bolt kitchen/food prep with updates to lobby and corridor.

    Complete Permit 202101273412 $$$ $7,000,000
  22. May 2021

    Ti upgrade core/shell restrooms on levels 2, 3, 4 and 8. work includes demolition, upgraded framing, drywall, tile work, and toilet partitions. upgrade plumbing, electrical and mechanical components. fire sprinkler and fire alarm on deferred submittal.

    Complete Permit 202105200701 $$$ $1,704,445
  23. Oct 2023

    4/f: ti new partition for proj work & utility rms. no change of use. all egress & life safety systems to remain in operation during & after construction. gc to provide temp exit signs/strobes as req by construction. no hazmat used/stored on site in limited qty.

    Complete Permit 202310108255 $$$ $2,200,000
  24. Oct 2023

    3/f: ti new partition for offices, mtg rms, & proj work rms. no change of use. all egress & life safety systems to remain in operation during & after construction. gc to provide temp exit signs/strobes as req by construction. no hazmat used/stored on site.

    Complete Permit 202310108253 $$$ $1,800,000
  25. Dec 2023

    4/f: deferred mep for bpa# 202310108255: add new water source heat pumps; new transfer fans; demolition and reinstall vav reheat and colling boxes as needed.

    Complete Permit 202312152597 $$$ $1

DBI holds 406 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 406. 8 of them are nominal $1 street-space or sidewalk permits.

Ten years empty

The Loma Prieta earthquake of 1989 damaged the building badly enough that it stood vacant for about ten years. A retrofit completed in early 2001 combined steel braced frames with concrete shear walls and took the Structural Engineers Association of California's Excellence in Structural Engineering Award. Gordon Huether's Urban Grit — twelve panels of sandblasted kiln-fused glass, each three feet by four, hung in a 50-foot steel railing across the entrance — was unveiled that July, worked up from his own photographs of cracked pavement and peeling paint.

Not yet documented: the architect and builder and the early tenants. The assessor and a CommercialCafe listing both record 1928; a Structural Engineers Association of California case study on the building's seismic retrofit records 1927. Submit an update