215 Fremont Street
East Cut · San Francisco, CA 94105
Public art
- Urban Grit — Gordon Huether
Glass; pathway to entrance; artwork is always accessible.
Installed 2001.
Permit history
-
Feb 1982
Otc alterations permit.
-
Nov 1999
Vertical addition.
-
Jul 2000
Revision #9924190 add approx 24000 sq ft in between 7th & 8th floor to make this a 9 story building.
-
Oct 2000
Oti-1 3/f el me ls sp.
-
Mar 2001
Oti-1 5th floor, ltg, mechanical, ls, spr.
-
Mar 2001
Oti-1 6thfl, ltg, mechanical, ls, spr.
-
Mar 2001
Oti-1, 4th floor, ltg, mechanical, ls, spr.
-
May 2001
Stret space.
-
Jun 2001
Minor demolition of drywall partitions, new conf rm; dev. of 9th floor terraces; chg use fr b to a-3.
-
Jul 2001
Oti-7 7th fl ltg mechanical ls spr.
-
Aug 2001
Street space.
-
Nov 2001
Street space.
-
Mar 2002
Stree space use /sidewalk permit.
-
May 2017
6/f- interior demolition of non-structural elements including but not limited to partition, doors, lighting and ceiling. construct of new offices, conference, break area and new finish. life safety, fire alarm and sprinkler are under separate permit. n/a ordinance #155-13 incuding mep.
-
May 2017
Interior demolition of non structural element including but not limited to partiton, doors, lighting, ceiling. construction of new offices, conf room, break rms, finishes, mechanical, electrical, plumbing, ls, fire alarm, sprnkler plans sep permit.
-
Mar 2018
Interior demolition and buildout of 5th floor. mechanical, electrical, plmg, life safety, fire alarm and sprinkler modification will be under seperate permit. n/a for maher !!!!!no ceiling demolition peritted!!!!!!.
-
Oct 2018
5th floor: commercial t.i. to include new private offices and upgrade to existing offices, conference rooms, break area, and new led throughout. n/a for maher.
-
May 2019
2nd fl: limited demolition of existing partitions, finishes, ceilings & light fixtures. new partitions, finishes, ceilings & light fixtures for offices, conference rooms, and partries. micro kitchen under separate permits. basement modification.
-
Oct 2019
8th floor: mep drawings to support approved arch. set for employee cafeteria. demolition of ductwork and equipment. install new ductwork and equipment. ref app#201907226536.
-
Jan 2021
Level 6 t.i: update lobby, core/shell restrooms, conference rooms, library and micro kitchen. demolition under separate permit.
-
Jan 2021
Level 8 t.i: includeds fitness area locker rooms, restrooms and cafe, bolt kitchen/food prep with updates to lobby and corridor.
-
May 2021
Ti upgrade core/shell restrooms on levels 2, 3, 4 and 8. work includes demolition, upgraded framing, drywall, tile work, and toilet partitions. upgrade plumbing, electrical and mechanical components. fire sprinkler and fire alarm on deferred submittal.
-
Oct 2023
4/f: ti new partition for proj work & utility rms. no change of use. all egress & life safety systems to remain in operation during & after construction. gc to provide temp exit signs/strobes as req by construction. no hazmat used/stored on site in limited qty.
-
Oct 2023
3/f: ti new partition for offices, mtg rms, & proj work rms. no change of use. all egress & life safety systems to remain in operation during & after construction. gc to provide temp exit signs/strobes as req by construction. no hazmat used/stored on site.
-
Dec 2023
4/f: deferred mep for bpa# 202310108255: add new water source heat pumps; new transfer fans; demolition and reinstall vav reheat and colling boxes as needed.
DBI holds 406 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 406. 8 of them are nominal $1 street-space or sidewalk permits.
Ten years empty
The Loma Prieta earthquake of 1989 damaged the building badly enough that it stood vacant for about ten years. A retrofit completed in early 2001 combined steel braced frames with concrete shear walls and took the Structural Engineers Association of California's Excellence in Structural Engineering Award. Gordon Huether's Urban Grit — twelve panels of sandblasted kiln-fused glass, each three feet by four, hung in a 50-foot steel railing across the entrance — was unveiled that July, worked up from his own photographs of cracked pavement and peeling paint.
Not yet documented: the architect and builder and the early tenants. The assessor and a CommercialCafe listing both record 1928; a Structural Engineers Association of California case study on the building's seismic retrofit records 1927. Submit an update