301–315 Howard Street
East Cut · San Francisco, CA 94105
Permit history
-
Aug 1983
Demolitions.
-
Apr 2007
Ssa/odar: oti-1 16th floor el, me, ls, sp.
-
Dec 2014
2nd floor tenant improvement non-rated non-structural partitions, ceilings, lighting, finishes; maher n/a.
-
May 2015
6th floor -this project entails a build out of an existing vacant suite. project scope includes: selective demolition of non-structural non-rated elements, new non-structural partitions, new ceilings & lightings, new finishes, new doors, frames & hardware. n/a maher ordinance.
-
Sep 2015
18th floor: project scope: selective demolition of interior non structural non-rated elements, new non structural partitions, doors and millwork, new ceilings and lighing, new doors, frames and hardware and new finishes. n/a for maher.
-
Mar 2017
19/f- interior non-structural demolition and limited construction in a full floor unoccupied tenant suite and full accessibility upgrades to men's & women's mutiple accommodation toilet rooms & drinking fountain. mep/fire under separate permits. n/a ordinance #155-13.
-
Jul 2017
7th fl. arch-full fl ti: demolition of existing non-structural interior partitions, doors, sidelights, ceilings & finishes. new non-structural partitions and door/frame/hardware. new ceiling, lighting, new finishes & millwork. no card readers mep/fire under separate permits.
-
Nov 2017
Ti of existing unoccupied full floor tenant suite. slective demolition of existing non-structural interior partitions, doors, sidelights, ceiling & finishes. new non-structural partitions, door/frame/hardware, new ceiling, lighting, mep & life safety to tie into existing building utilities. new finishes & millwork.
-
Dec 2017
Ti 20th fl: selective demolition e lt fixt, electrical outlets. new non stuc partitoinis, door/frame hardware, new ceioing lighting, electrical, plumbing, mechanical, ls tie into e building. utilitiesnew finishes, millwork. no change occupancy use. demolition restrm upgrades under 201702149346. maher na.
-
Dec 2017
Tenant improvment 21st fl: demolition o e lt fixt, electrical, new non struc partitions, door/frame hardware, new ceiling lighting, electrical, plumbing, mechanical, ls into e building utilities. no change occupancy use. restrm and demolition under 201702149345. maher na.
-
Apr 2018
Ste 700 - ti of an existing, untoccupied full floor. selective demon, existing light fixtures & outlets, flooring. new non structural partitions, lighting, electrical, mechanical, life safety to tie into existing building utilities & selective plumbing work. no change in occupancy or use. mep, fire & life safety under.
-
May 2018
11th fl: t.i. to include demolition of e non-strctrl interior partitons, doors, sidelights, ceiling & finishes. nw non-strctrl partitionsdoors/frame/hardware. nw ceiling, lighting, electrical, plmg, mechanical, & lifesafty to tie into existing building utility.nw finshes, millwork. no change in occupancy use or area.
-
May 2018
This is a 12, 305sqft interior improvement on 17th fl of existing 23 story building. the work includes new partitions, doors, ceilings, plumbing fixtures in break room area and modify existing ducts. maher na.
-
Jun 2018
15th floor: t.i. demolition of existing non-structural interior partitions, doors, sidelights, nw ceiling and nw finishes, mw. new non-structural partitions door/frame/hardware. new ceiling, lighting, electrical, plmg mechanical. & life safety to tie into existing building utility. new finishes & millwork. project includes.
-
Dec 2018
T.i. of existing full floor tenant suite. scope of work to include non-structural demolition, new (non)- structural partitions, lighting, millwork & finishes, toilet room upgrade, no change in occupancy, use, or area.
-
May 2020
Replace existing chillers and chilled water pumping system. provide new energy management system and intergrate into existing system.
-
Jul 2020
18th floor: t.i. of an existing full floor tenant suite. scope of work include: non-structural demolition, new non-structural partitions, lighting, millwork and finishes. toilet room upgrades. no change in occupancy, use or area.
-
Sep 2020
Tenant improvement on 20th & 21st fl to include demolition of existing partition. new interior partirions, ceiling, wall and floor finishes. structural work to enlarge existing stair opening.
-
Sep 2020
13th floor: ti of an existing multi-tenant floor. non-structural demolition, new non-structural partitions, lighting, millwork & finishes.toilet room upgrades. no change in occupancy.
-
Oct 2020
16th floor. interior tenant improvement of a full floor occupied tenant suite incl selective interior non-structural demolition of partitions, ceiling, lights, finishes, millwork. new hearing rms, lobby, interior offices, ceilings, lights, millwork, finishes. upgrades to single accommodation toilet room.
-
Jun 2021
2nd fl suite 200: ti of an existing full-floor unoccipied speculative suite. scope of work to include non-structural demolition, new non-structural partitions, lighting, millwork & finishes. toilet room upgrade. no change in occupancy, use, or area.
-
Sep 2023
14/f. demolition and build back of non structural partitions, doors, ceilings, lighting and millwork at ste 1410. minor accessiblity upgrades at restrooms. mep deferred. fire alarm and sprinkler on separate permit.
-
Jul 2025
5th fl, ste 500 existing office remodel that includes selected demolition and new construction of walls, floors, electrical, ceilings and light fixture removal/replacement, new phone booths. mep deferred.
-
Apr 2026
4th fl office t.i. entire floor. includes non bearing partitions, office glass, door, walls, finishes, mep upgrades. demolition separate permit.
-
Apr 2026
3rd floor: office full floor ti construction includes interior partitions, door, walls, finished, ceiling, mep upgrades. structural work for phone booths, trans firework, water heater.
DBI holds 734 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 734. 11 of them are nominal $1 street-space or sidewalk permits.
The relocated gas station
A 1931 Zig Zag Moderne petrol-station office, originally at Larkin and Pacific Streets, was moved to the corner of Beale and Howard in April 1990 and served as a food stand for about twenty-five years. SPUR's guide places the structure inside this building's own open space; San Francisco Heritage places it kitty-corner to the tower and records its removal in 2016 for a different office project. This page does not resolve which.
Not yet documented: the developer, the early tenants and who designed the open space. The assessor records 1987; Wikipedia states the building was completed in 1988. Submit an update