181 Fremont Street
East Cut · San Francisco, CA 94105
Permit history
-
Sep 1983
Brace parapets.
-
May 2013
To erect 54 stories, 5 basement, 74 residential units with retail, office, parking building.
-
Sep 2013
Temporary support for excavation. site permit under permit application 2013-05-01-5894s. under maher ordiance and is excavate more than 50 cubic yard of soil.
-
Nov 2017
25th floor - construction of non-structural partitions, ceiling, light fixtures, finishes. construction of new convinence stairs from 25th to 26th floor. construction of new ktichen & servery. n/a maher ordinance.
-
Nov 2017
27/f- construction of new structural partitions, ceilings, light fixtures, millwork & finishes, construction of pantry. n/a ordinance #155-13.
-
Nov 2017
26th floor - construction of non-structural partitions, ceiling, light fixtures, finishes. n/a maher ordinance.
-
Nov 2017
28/f- construction of new structural partitions, ceilings, light fixtures, millwork & finishes. n/a ordinance #155-13.
-
Dec 2017
7th fl - ti of non-structural walls, new ceilings, new security desks, lounge. demolition existing restrooms. construction of new public restrooms.
-
Jan 2018
30th floor: full floor tenent with non-structural partitions, new ceilings, millwork, finishes. convenience stairs, fire alarm sprinklers on separate permit. n/a for maher.
-
Jan 2018
31st floor: full floor tenent with non-structural partitions, new ceilings, millwork, finishes. convenience stairs, fire alarm sprinklers on separate permit. n/a for maher.
-
Jan 2018
29th floor: full floor tenent with non-structural partitions, new ceilings, millwork, finishes. convenience stairs, fire alarm sprinklers on separate permit. n/a for maher.
-
May 2018
Level 9: construction of new non-structural partitions, acoustical grid and tile and gyp board ceilings, light fixtures, millwork, and finishes. fire alarm and sprinklers under a seperate permit. type-i hood exhaust system under separate permit.
-
May 2018
Installation of 4 levels of convenience stairs floor 35 thru 38. two hour enclosure at level 35.
-
May 2018
8/f: construction of new non-structural partitions, acoustical grid and tile and gyp board ceilings, light fixtures, millwork, and finishes. fire alarm and sprinklers under a seperate permit.
-
May 2018
11th fl - construction of new non-structural partitions, accoustical grid and tile and gyp board ceilings, light fixtures, millwork and finishes. fire alarm and sprinkler under a separate permit.
-
May 2018
10th fl - construction of new non-structural partitions, acoustical grid and tile and gyp board ceilings, light fixtures, millwork and finish. fire alarm and sprinkler under a separate permit. maher n/a.
-
May 2018
Level 12 construction of new non structural paritions, acoustical grid and tile, and gyb bd ceilig light fix, millwork, finishes. fire alarm fire spr, stairs under sep permit. maher n/a.
-
May 2018
13th fl ti constuction of new non structural partitions, acoustical grid and tile and gyp bd ceiling. construction of kitchen and servery. structural reinforcement to cooridinate with mep service maher not req.
-
Aug 2018
15th - ti with no bearing partitions for open office.
-
Aug 2018
14th - ti with no bearing partitions. kitchen with back of house support areas. offices & conference rooms.
-
Aug 2018
6th floor - arch ti - non structural walls, office millwork, finishes, kitchen and servery. mep under separate permit.
-
Aug 2018
5th floor - arch ti - non bearing walls, office millwork, finishes, kitchen and servery. mep under separate permit.
-
Feb 2020
To obtain final inspection for work approved under permit application 201305015894. all work is complete.
-
Oct 2020
Replace exiting dedicated outside air units & associated duckwork and piping.
-
Apr 2026
Parcel b. level 12: interior only. scop includes demolition of select light fixtures, non-structural walls, mechanical ducts and equipment. addition of new non structural walls/partitions, doors, new equipments, overlead mechanical and electrical, new pantry cabinets, equipment and millwork/finishes.
DBI holds 364 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 364. 12 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants, who designed the open space and the date of the last recorded sale. Submit an update