425 Mission Street
East Cut · San Francisco, CA 94105
-
1939
Built as the Transbay Terminal to designs by Timothy Pflueger and Arthur Brown Jr., linked to the new Bay Bridge by a looping concrete viaduct that carried Key System trains into downtown. It was planned for 35 million passengers a year and handled 26 million at its wartime peak.
-
1959
Turned into a regional bus depot, after the lower deck of the Bay Bridge was given over to cars in 1958 and the Key System dismantled.
-
Jan 2019
Tjpa office in transbay transit center ste 226. first time tenant improvement of lpc office at second level, non-structural partitions, fixtures & finishes, topping slabs scope does not include exterior work, square footage of ti is 7, 824 sq ft. maher n/a.
-
Jan 2019
Tjpa lpc office in transbay transit center ste 232. first time tenant improvement of lpc office at second level, non-structural partitions, fixtures & finishes, topping slab scope does not include exterior work, square footage of ti is 2, 385 sq ft. maher n/a.
-
Jan 2019
Tjpa office in transbay transit center ste 226. for fire larm and pa system communication, reference to ti permit #20190124161. maher n/a. no sprinkler work under this scope.
-
Feb 2019
Tjpa first ti for street level coffee shop suite 100. scope to include instalation of new gysum board walls & ceilings, millwork, finishes & food servie equip. mechanical, electrical & plumbing systems.
-
Feb 2019
Proj-19-0224. at suite no 123, tenant improvements for a new leased space on ground floor of transit terminal as self-service fast food, restrooms are in common areas. maher n/a.
-
Mar 2019
Ti-tjpa project. suite 139-charley's philly steaks. interior tenant build out to an existing shell, tenant space approx 971 sq ft.
-
Mar 2019
Tjpa, 1st t.i. for a-a fitness use in 34, 875 sq ft on 2nd floor of existing building suite 208/212, new demising walls for studis, lockers, lockers, reception & juic bar, new ceiling & locker rm, laundry rm, hot water system, new distribution of hvac system, exhaust fans, lighting modifications & extension of.
-
Mar 2019
Tjpa, shell building improvement for 34, 875 sq ft of tenant space on 2nd floor for suites 208 & 212, demolition of existing walls, doors, storfronts& equipments, new concrete topping slab, new hvac system, new eect panels, new plumb poc for tenant work tie-in, new walls & doors for elelct rms. no sfusd.
-
Apr 2019
Tjpa - proj-19-0242. toping slabs & demising walls for ground & second level retail suites within the transit center. scope of work does not include exterior work. square footage of this project is 24, 005 for ground floor & 6, 537 for second floor, total of 30, 542.
-
Apr 2019
Mou transbay-suite #143. tenant improvement for phill coffee, to include barrista stations back of house prep area, customer & employee areas. will inlude changes to mechanical, ele, & plumbing. **maher n/a**.
-
Apr 2019
Proj-19-0249; tjpa-ti space# 216, 218 & 220 (dental office). 1st time t.i. on the 2nd floor of the transit center. total square footage is 3323 sq ft.
-
Dec 2019
Tjpa-ti. suite 145. demolition for trenching of existing slab. construction of non-bearing partitions, finishes, millwork and fixtures.
-
Dec 2019
Tjpa ti suite# 103. project#-19-0300. interior t.i. remodel to existing tenant space on 1st floor(suite 103), for new restanrant tenant. scope to include non-strucral partions millwork and finishes and lighting, equipment, and mep.**maher n/a**.
-
Jun 2020
T.i. of suite 200 located within 2nd floor of existing salesforce transit center@ 425 mission st. work consists of improvement of existing 3655 sq ft shell space into convenience care center for kaiser permanente. project does not require oshpd 3 review.
-
Aug 2020
#107 & 111. this project to propose a restaurant to add a kitchen with type i hoods. all equip, ware, washing and prep area with all equip. bar, dining area, and ada restroom for employees only. associated mechanical, electrical, and plumbing work.
-
Aug 2020
Suite 127 - ti project for a fast food restaurant in existing vacant space. add kitchen and service area with all equipment, with associated mep work (poke house).
-
Sep 2020
T.i of retail suite# 131. constructin of new kitchen, dining area, storage, restroom and bar.new plumbing, mechanical, and electrical.
-
Sep 2020
Tjpa-ti. suite# 222/224. t.i of an existing space. work to include office. no change of use. interior non-bearing partitions. millwork & interior finishes. mep as required. card readers. ** maher: n/a **.
-
Sep 2020
Tjpa-ti. suite# 105. t.i. construction of new boba tea bar to include: electrical, plumbing, counters, flooring, new equipment, lighting and partition walls. deferred submittal: signage, sprinklers, fire alarm.
-
Oct 2020
Proj-20-0332. tjpa-ti. #125 & #129. new interior. create a new restaurant within existing commercial tenant space. work includes new mechanical ventilation for commercial kitchen, new electrical & lighthting, new accessible restrooms & new finishes throughout. no vertical or horizontal addition.
-
Jul 2021
Proj-21-0365: tjpa-ti mou. bse building improvements. construc 1 new mechanical scrubber room within existing struc. int. improvements to 2 existing utility/mechanical rooms to house new mechanical equipment incl mechanical scrubber equip & assoc electrical & plumbing work. topping slabs. 2fsd's. fire alarm/sprinklers/ansul(4) deferred.
-
Aug 2022
Proj-22-0480; space # 133, ground level market space tenant build-out for retail use.
-
Aug 2022
Proj-22-0478. space # 137, tenant build-out of existing ground levelfor office use.
-
Dec 2022
Proj-22-0516: tjpa ti mou - tenate build out of 9e) park level restaurant space #p-01. vertical addition of enclosed roofpark mezzanine (dbi pre-application meeting 4/30/22). roof top mechanical equipment.
DBI holds 103 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 103. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants and the date of the last recorded sale. Submit an update