415 Mission Street
Office building
-
Mar 2013
To erect 63 stories with 3 basements, office, retail, parking building.
-
Dec 2013
Excavation & shoring only. cdsm, bracing, tie back. compliance with ordinance no# 155-13 exempted. approval from dph attached.
-
Mar 2015
Rev to app #201312194603 revision 1, excavation of lbes below the main excavation of transbay tower project: summary (1) installation of jet grout columns, secant piles and rc slab to support the excavation for repair of lbes 2. monitoring plan 3. sequencing of primary milestones during constrution.
-
Sep 2017
35/f- tenant improvement walls, ceilings, finishes -no mechanical or electrical.
-
Sep 2017
34/f- t.i. in new office building. n/a ordinance #155-13. mep under separate permit.
-
Sep 2017
31st fl: ti for new tenant. mep & l/s under seperate permits. maher n/a.
-
Sep 2017
32/f: tenant improvement. mep & l/s under seperate permits. maher n/a.
-
Oct 2017
13th floor - single tenant improvement for entire 13th fl. work includes access flooring, partitions, mep & finishes. maher na.
-
Oct 2017
14th floor - single tenant improvement for entire 14th fl. work includes access flooring, partitions, mep & finishes. maher na.
-
Oct 2017
46th fl: first time ti includes interior work, excluding mep & fire protection. valuation of mep & fire protection included in this t.i. maher na.
-
Nov 2017
33rd floor, ti & mep for new occupancy. new assembly on 33rd floor. ** maher: n/a **.
-
Dec 2017
16th lfr: single ti of entire floor including new access flooring, partitions, mep, finishes & furniture maher na.
-
Dec 2017
18th floor: single ti of entire floor including new access flooring, partitions, mep, finishes & furniture maher na.
-
Dec 2017
17th floor: single ti of entire floor including new access flooring, partitions, mep, finishes & furniture maher na.
-
Dec 2017
36th fl: installation of non-bearing partitions, ceiling, millworks & fixtures. card readers at elevator lobbies. sprinkler & fire alarm on separate permits. maher na.
-
2018
Built.
-
Feb 2018
On p2 & p3 level. installation of on site water reuse system, new concrete tank p3 level piper kujac - project manager 4155192711 maher na.
-
Feb 2018
19th floor - first occupancy - single tenant improvement, new access flooring, partitions, mechanical, ele., ceiling and lighting, finishes and social gathering area which includes pantry. no structural work. maher na.
-
Feb 2018
20th floor - first occupancy - single tenant improvement, new access flooring, partitions, mechanical, ele., ceiling and lighting, finishes and social gathering area which includes pantry. no structural work. maher na.
-
Feb 2018
21st floor - first occupancy - single tenant improvement, new access flooring, partitions, mechanical, ele., ceiling and lighting, finishes and social gathering area which includes pantry. no structural work. maher na.
-
Aug 2018
Arch & structural work on level 28, 29, 30. demolition existing floor slab on 29 & 30 - construction of a new interconnecting stair between 28 & 29 and 29 & 30. including handrails, guardrails, bench, soffits & smoke baffles - interior partitions under sep permit. maher na.
-
Aug 2018
28th fl: single tenant improvement to the entire floor - new access flooring, partitions, mep. no structural work. maher na.
-
Jan 2019
42nd fl - ti for entire floor includes new access flooring, partitions, mep, ceilings, lighting & employee limited cafe.
-
Jan 2019
44th fl - ti for entire floor includes new access flooring, partitions, mep, ceilings, lighting & employee limited cafe.
-
Jan 2019
51st floor, t.i. interior build-out of approx 7, 991 sq ft. no structural work. no increase in area, no change in occ or use. life safety and sprinklers to be pulled separately. mep deferred.
DBI holds 533 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 533. 7 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 340–350 Mission Street Same street
- 425 Mission Street Same street
- 400 Howard Street Same block
- 50 Fremont Street Around the corner
- 100–104 First Street Around the corner
- 88 1st Street Around the corner