100–104 First Street
East Cut · San Francisco, CA 94105
Public art
- Linear Fountain — John Luebtow
Granite, glass; sun terrace; artwork is always accessible.
The water-wall sculpture, made of granite and glass, stands on the Sun Terrace, which also has tiered seating with artificial grass.
-
Aug 1983
Erect.
-
May 1987
Tenant development, structural electrical, plumb, see #8308265.
-
1988
Built as 100 First Plaza, a stepped-back tower clad in granite.
-
Feb 2011
18th floor space 1800 existing t.i., construction of non-load bearing partitions, new office doors & side lights, new ceiling grid & tile, new & relocated light fixtures, new millwork, new finishes, mechanical & electrical. fire sprinkler & life safety under separate permit.
-
Mar 2011
Existing t.i. space 1900 construction of non load bearing partitions, new doors, relocation of light fixtures and new finishes, mechanical and electrical fire sprinkler & life safety alarm under seperate permit.
-
Aug 2012
Tenant improvement to consists of demolition of non load bearing partitions associated electrical power/lighting associated mechanical. fire alarm/sprinkler seperate permit.
-
Jun 2014
Construction of full height partitions, doors, millwork on the 26th fl ls, sprinklers sep permit.
-
Oct 2017
25/f: improvements to unoccupied office suite. limited cieling, light fixtures and partition dmeolition, new non-structural partitions, glazing, celings, light fixture, millwork and finishes. ref pa201706300796.
-
Mar 2018
14th fl - ti to include 2 hour separation and horizontal existing new partitions, ceiling finishes. new gender neutral restrooms and break room. mep sep permit.
-
Jul 2018
Tenant improvement on the 10th fl to include new paritions, ceiling lighting, finishes. mep and fine life safety under sep permit.
-
Jul 2018
9th fl - full floor arch ti to include new partitions, ceiling, lighting and finishes. mep & fire life safety under separate permit, to include two-way communication systems, also deferred; mep & fire life safety under seperate permit.
-
Jul 2018
Tenant improvement on the 11th fl. improvements include new partitoins, ceiling, lighting, finishes. mep and fire ls under sep permit.
-
Jul 2018
5/f: tenant improvement to include new partitions, ceilings, lighting, finishes, new gender neutral restroom, and new assembly occupancy spaces. new 2 hour rated exit provided for egress compliance. mep, fire life safety under sep permit.
-
Aug 2018
7th floor. full floor tenant improvement. new partitions, ceilings, lights, and finishes. mep and fire life safety under separate permit.
-
Aug 2018
Full floor tenant improvement on 4th fl, new partitions, ceiling, lighting and finishes. mep deferred. fire alarm and sprinklers under separate permit.
-
Aug 2018
Full floor tenant improvement on 15th fl, new partitions, ceiling, lighting and finishes. mep & fire life safety under sep permit.
-
Aug 2018
6th floor -full floor ti: new partitions, ceiling and finishes, new gender neutral restroom, new 2-hr fire rated horizontal exit. mep/fire/life safety under sep permit add a-2 occupancy dining area.
-
Aug 2018
8th floor -full floor ti: new partitions, ceiling and finishes, new gender neutral restroom, new 2-hr fire rated horizontal exit for egress compliance. mep/fire/life safety under sep permit.
-
Dec 2019
T.i. improvement to include finishes, ligthing furniture power/data.
-
Dec 2019
Full floor tenant improvement on the 17th fl to oinclude new partitions, ceiling, lighting, finishes. new caferteria w no prep mep inc.
-
Dec 2019
Full fl ti on 16th fl to include partitions, ceiling, lighting and finishes. new mothers room, new cafeteria with no prep. mep included.
-
Dec 2019
Partial floor ti on the 12th fl - to include new partitions, ceiling, lighting, finishes. mep included.
-
May 2022
Demolition of existing partitions, ceilings, mechanical and electrical. construction of new partitons, ceilings, mechanical and electrical life saety fire sprinkler under sep permit.
-
Aug 2022
26/f: interior demolition of partitions, doors, finishes, ceilings, lighting, mechanical/electrical. new constr of partitions, lighting, ceilings, mechanical/electrical, plumbing & finishes. life safety/sprinkler permits deferred.
-
May 2023
13/f: interior t.i., open office area, meeting rooms, break area and training room. mep included. fire alarm/sprinklers deferred.
DBI holds 676 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 676. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants, when each artwork was installed and who designed the open space. Submit an update