519 Mission Street
Office building · East Cut
-
Sep 1984
Demolition.
-
December 4, 1985
The Board of Permit Appeals upheld the Department of Public Works and allowed the permit to demolish the building at 519 Mission Street to stand.
-
1988
Current structure built.
-
Mar 2005
Oti-1, 22nd fl, el, me, ls, sp.
-
May 2012
1st/2nd floors-remove existing & provide new lighting fixtures, plumbing fixtures, accessories & finishes. hallway, alcove, toilet rooms, provide new toilet rooms & shower rooms.
-
Oct 2013
Demolition of existing non structural partitions, existing ceiling. construction of new non structural partitions, doors, frames. millwork. demolition of unused duct work, relocate and install new vav box.
-
Apr 2014
Tenant improvement on the 10th floor, to include construction of new offices, project rooms and ammenity spaces, mep under sep. permit.
-
May 2014
Mechanical and electrical for t.i. on the 10th floor. ref arch. 201404082696.
-
Jun 2014
11th floor: t.i. to include demolition of non-structural partitions, construction of new non-structural partitions, new finishes and ceiling rework. mep, sprinklers and fire alarm separate permit.
-
Jun 2014
Mechanical and electrical for tenant improvement, new vav, new transfer fans, new lighting. ref. arch# 201306037389.
-
Dec 2014
Existing duct distribution being modified to serve new space one new vav unit to include new electrical work. ref app#201411181754.
-
Aug 2015
Demolition of e partitions, ceilings, lighting, floor finishes, and associated mechanical, plumbing, electrical in full floor, unoccupied office space. per ab 17. space will remain unoccupied. permit for construction and related accessible features required prior to occupancy. deferred submittals if req: l/s.
-
Sep 2015
3rd floor improvements to an unoccupied office suite. improvement include non-structural partitions, casement, ceilings, lighting & finishes. deferred submittals for t-24 mechanical & electrical, life safety & sprinklers.
-
Oct 2015
3rd floor: lighting and mechanical work pr t-24, include new lights vav boxes, grilles and ductwork. ref pa 2015 0924 7927. no new fire smoke dampers.
-
Dec 2015
12th floor; partial floor tenant improvement, demolition of non structural partitions. new partitons, ceilings, finishes, electrical and mechanical.
-
Dec 2015
22nd floor suite #2200 & 2250: combine 2 existing tenant suites into one larger suite, improvements inlcude non structural partitions, casework, ceiling, lights and finishes.
-
Jan 2016
3rd fl ti demolition accoustical tile ceiling grid new accoustical tile ceiling/grid. finsih upgrade. new or revised mep, ls, sprinklers design build if needed.
-
Oct 2017
25/f: improvements to unoccupied office suite. limited cieling, light fixtures and partition dmeolition, new non-structural partitions, glazing, celings, light fixture, millwork and finishes. ref pa201706300796.
-
Nov 2017
25/f- mechanical: 4 new water source heat pumps, duct distribution. electrical: new lighting and branch circuiting. permit application 201710131195.
-
Jul 2018
22nd floor: mep, life safety, fire sprinklers & alarm deferred, demolition of partitions, millwork finishes, ceiling & lighting fixtures, construction to include partions (non-structural) ceiling and tile, lighting fixtures & finishes.
-
Jul 2018
3rd fl - merging with neighbor unit- finish removal, construction of new non-structural partitions, new finishes, restroom accessibility upgrades (tenant work) mep, sprinklers and fire alarm separte permits. demolition number 201807164615.
-
Nov 2018
Ti project on modification of existing fire alarm system for floors 5, 9, 10 and 11 modification shall include providing notification coverage throughout and duct detectors at fpb units ref pa 5th fl -2018-0711-4230, 9th fl - 2018-0711-4234, 10th fl - 2018-0711-4231 and 11th fl - 2018-0711-4240.
-
Mar 2020
Installing new security turnstiles @ 1st & 2nd fl elevator lobbies, moving elevator kiosk screens on 1st fl and installing new accessible closer and wireless push buttons/activator bar at exist onto 2nd floor terrace.
-
Dec 2023
3/f: demolish e non structural walls, glazing, door, power and signal, patch and match finishes, construct demising wall, glazing and install a few light fixtures to match existing. rework hvac as req.
-
Jan 2024
12th fl: demolition non-structural walls, ceiling, lighting, millwork, door, glazing, finishes. construct new non-structural walls, millwork, ceiling, lighting & finishes.
-
Jun 2024
Commercial tenant improvement of a limited service restaurant with limited food prep. no change in occupancy. area of remodel is limited to the first floor, ste 170. demolition existing floors and ceiling. construct new partition between kitchen and service area. upgrade electrical service, install new water.
DBI holds 90 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 90. 1 expired permit is not shown.
Nearby
- Printing Arts Building Same street
- 526 Mission Street Same street
- 100 First Plaza Same block
- 110 1st Street Same block
- 22–525 Mission Street Same block
- 118 1st Street Same block
- Brandenstein Building Around the corner
- 82–84 1st Street Around the corner