88 1st Street
East Cut · San Francisco, CA 94105
-
1907
Built as the Brandenstein Building.
-
Nov 1983
Construct wall.
-
Jun 1985
New construction.
-
Jun 1988
Install non-bear partition walls, sheetrock, ceiling tile.
-
Jul 1990
Addition of 2 doors, replacement of window.
-
Oct 1998
Interior restaurant remodel & other tile 24 modifications.
-
Sep 1999
One-stop, install cellular tele eqp cabinet, mount antenna.
-
Feb 2000
Disabled curb cut over existing sub-sidewall valut.
-
Feb 2000
Interior floor wall & ceiling finishes.
-
May 2000
Framing walls in the basement for radio equipment with antennas 30 to 40 on building.
-
Jun 2000
Street space.
-
Jul 2000
3wall demolition/2new office/new cabinet@kitchette/relocate8 lite fixtures/1 sink.
-
Mar 2001
Street space.
-
Mar 2001
Street space.
-
May 2001
Street space.
-
Oct 2001
Street space.
-
Feb 2009
Remove tdma & 3303 radio cabs., leave coax lines, jumper, splitters & diplexes, install (1)newdiplexes swap single band omni antenas with new dual band omni antennas. install one new 3518 radio cabinet in 2 radio units and back up battery pack. no new electrical.
-
Oct 2010
A modification to an existing unmanned telecommunication facility consisting of removing existing omni antennas & existing equipment in basement & adding 8 new pbc-02 cabinets, 3 new 3518 rbs cabinets, a new 6601 rbs cabinets in a new 19" rack and 3 new 2111 rbs cabinets. also adding 6 new antennas in radomes.
-
May 2015
Remove att cell site affixed to nw corner of building at second story level. patch wall to match existing. no other work.
-
Aug 2016
A new verizon wireless unmanned telecommunications facility, consisting of the installation of 12 panel antennas and associated radio equipment.
-
Jul 2017
Temporary work for construction office. new supplemental fan coils on floors 2, 3, 4. new condensing unit on roof and new ductwork, grilles, and thermostats for air distribution.
-
Feb 2022
Verizon wireless to existing verizon wireless cell site removing & replacing 4 existing antennas with 4 new antennas; removing & replacing 3 existing pipe & port covers w 3new port & pipe covers; retaining 8existing antennas.
-
Jan 2026
Remove non structural office partitions. remove drop ceilings. remove floor finishes. building remain vacant under ab-017.
-
Jan 2026
Construction pertaining to the tenant improvements for a relocated fedex office store. work includes new finishes, graphics, lighting, ceiling, new and relocated fixtures and equipment, distribution of phone and power/data to equipment, new mechanical and modified electrical work.
-
Mar 2026
Errect 2 single face electric wall signs (fedex). same size front and back.
-
Jul 2026
Ground fl building shell improvement. new accessible single user restroom and janitor closet in existing vacant tenant space. space to remain vacant until future tenant improvement consturction is permitted and finalized. no exterior work.
DBI holds 38 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 38. 3 of them are nominal $1 street-space or sidewalk permits.