62 1st Street
East Cut · San Francisco, CA 94105
-
1917
Built as the Neustadter Brothers Building.
-
May 1982
Building use: offices.
-
Jul 1982
Building use: office.
-
Apr 1988
Column removal & seismic upgrade.
-
Apr 1988
Ti, re-carpeting, ceiling, finishes.
-
May 1988
Revision to approved application #8804310.
-
Sep 1996
New mechanical penthouse, r.t.u.on roof, selective demolition, soffit, ramp.
-
Feb 1997
Fire sprinkler system riser from bsmt to 5th fl with future stu.
-
May 1997
Cti i - 2nd floor (el-me-sp).
-
May 1997
Tenant improvement-new cafe.
-
May 1998
Oti-1 3rd floor el, me, l/s sp.
-
Apr 2000
Oti-1: el, me, ls, sp 3rd floor.
-
Apr 2000
Oti-1 e., me, ls, sp, b floor.
-
Dec 2000
Oti-1 4th floor, ltg, me ls, spr.
-
May 2002
Boiler installation on 5th floor.
-
Jun 2002
Remodel of existing office space on the 2/f which includes ltd partition demolition new non structural partitio.
-
Nov 2013
Exterior painting of 1st st facade. minor interior modifications, paint & new floor finish @ entry lobby. new conference room & coffee area 5th fl with new paint & floor covering throughout hvac, life safety, &fire sprinklers under sep permit. no exterior modifications. no increase in office space.
-
Jan 2014
T.i. permit application 2013-11-26-2834 1st fl change out 3 heads, 5th fl add 110 heads. total 113 heads.
-
Mar 2014
Basement, 1st&2nd floors: t.i. non structural walls, new work stations, expansion of women restrooms, minor mechanical, plmg, electrical modifications. deferred submittals: fire alarm/lifesafty, mechanical, electrical, plmg, fire sprinklers.
-
Mar 2014
Title 24 mechanical for basement, 1st, and 2nd fl ref 201403039704.
-
Apr 2014
Basement, 1st, 2nd floor - add devices to existing fire alarm system. ref #2014.0303.9704. 3 power supply, 13 pull stations, 18 smokes, 4 heats, 3 relays, 18 strobes, 30 horn/stobes.
-
Apr 2014
Fire sprinkler permit, relocate 44, add 10 and delete 11 pendents, delete 2 uprights, t.i. permit application 201403039704.
-
Aug 2014
5th floor: tenant improvement, 2 new phone rooms, 5 new conference rooms, doors, frames, hdw, finishes, light fixtures, mechanical (added supply & return diffusers) electrical, fire sprinkler under separate permit.
-
Mar 2016
Abatement and related soft demolition to prepair the building for demolition. removal of flooring, interior walls and ceilings, pipe insulation and roofing.
-
Apr 2016
To demolish 5 stories office / retail building.
DBI holds 66 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 66. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update