76–78 1st Street
East Cut · San Francisco, CA 94105
-
1908
Built as the Marwedel Building.
-
Feb 1985
Provid bracing for building parapet in order to comply.
-
Dec 1989
Ewo-s.
-
Sep 1991
Replace sidewalk.
-
Oct 1995
Seismic upgrade to general procedures, handicap upgrade.
-
May 1997
Selective demolition of non-structural partitions, finishes.
-
Jul 1997
Provide accessible entry, bathrooms & elevator, stairs, etc.
-
Oct 1997
Reroofing.
-
Oct 1998
Barrier removal only enlargeing elevator penthouse.
-
Dec 1998
Rev. to 9801378.
-
May 1999
Renew permit appl-9821738 for final.
-
Aug 1999
Add two partitions & 2 doors.
-
Aug 1999
Renew expired appn. 9712352 for final inspection.
-
Oct 1999
Addition to app #9915818.
-
Dec 1999
Partitions bwl & tel outlets doors extendexistingavac ductwork.
-
Mar 2000
Oti-1 1st floor electrical mechanical lifesafty.
-
Apr 2004
Renovation 2 floors & portion of basement to accomodate 1 new tenant, install new partitions on 4 & 5.
-
Dec 2004
Retro fit fire spirnkler for an existing building 185 heads basement 1-6 floors.
-
Dec 2004
Fire alarm system.
-
Feb 2014
Install looking security gates at each end elim alley with fail save panic egress hardware to discourage use of alley as toilet facility by vagrants. note: permit application requested by bsm (nick elsner, who has verbally approved the installation.
-
Oct 2015
Remodel existing office building as shown on drawings.
-
Mar 2016
Asbestos abatement and related soft demolition to prepair the building for demolition. removal of flooring, interior walls and ceilings, pipe insulation and roofing.
-
Sep 2016
Demolition alteration of building. work also includes temporary bracing.
-
Apr 2017
Administrative permit only, no work. for partial compliance to nov 201772602, revision to 2016097343 sheet d1, d2. remove ref to scaffolding on cantilever support over adjacent building at 82-84 1st, 25 jessie and 1 ecker st.
-
May 2017
To comply with nov 201772602 - install cantilever beams for support of platform at 82-84 1st street 3708/008 faciliting scaffold erection over 82-84 ast street.
DBI holds 25 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 25.
Not yet documented: the architect and builder and the early tenants. Submit an update