116 1st Street
Office building · East Cut
-
Aug 1983
Erect.
-
December 4, 1985
The Board of Permit Appeals upheld the Department of Public Works and allowed the permit to demolish the building at 116 First Street to stand.
-
1988
Built.
-
Jan 2001
Remove 9 lf of storefront, at suite 100 install new wall/door & 2 atm's.
-
Sep 2005
Oti-2 26th fl el me.
-
Dec 2006
Oti-1 2nd fl, el.
-
Mar 2008
Hvac work on the 17th floor. ref. permit application 2007/12/31/1643 fire alarm seperate permit.
-
Apr 2011
Modify fa system for t. i.build out on floors 18, 19, 20, 21, 22, 23 & 24. adding 22 smoke detectors, 27 duct det. with 27 controlrelays, 143 speaker strobes, 32 strobes and 2 input modules.
-
Oct 2011
Demolition of non structural partitions and building new non structural partitions. all new or revised hvac, electrical and life safety work will be design build and submitted separately.
-
Oct 2011
Demolition of non structural acoustic ceilig and installation of new non structural acoustic ceiling. all new mechanical and electrical will be design build & submitted separately.
-
Jul 2013
3rd floor-suite #350-ti includes demolition of non structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing & life safety are design build & submitted for permit separtely. building fully sprinklered building is "fully sprinklered".
-
Oct 2013
Gb01 (1st floor)-upgrade existing shell retail to new bakery. new electrical, plumbing, mechanical under seperate permit. sprinklers and fire alarm separate permit.
-
Dec 2013
Ground fl. (2) two new unisex restrooms & aesthetic. upgrades to the ground common area. mep. under seperate permit.
-
Mar 2014
Tenant improvement from existing food retail to new food retail, including new service area, partition walls, casework, interior lighting, plumbing and electrical work.
-
Apr 2014
New outside air fan and associated ductwork on the second floor.
-
Jun 2014
Construction of full height partitions, doors, millwork on the 26th fl ls, sprinklers sep permit.
-
Jun 2014
Ground floor suite 279: title 24 el4ectricla lighting & power work for existing panel. ref permit application 2013.1217.4414 fro architectural permit.
-
Nov 2014
12th floor: new corridor being created on a multi tenant floor. 2 new demising walls. elevator lobby work. etc, mep, sprinkler or life safety work if needed will be under 201501054876 separate permit.
-
Feb 2015
12th floor: lighting and mechanical work per title 24, work includes new lights and installing new grilles, relocate existing grilles and duct work. ref. to permit application 201411262611 for architectural work. revision to arch is 2015-02128131.
-
Jul 2015
Selective demolition of designated partitions, flooring, plumbing fixtures, ceilings, lights as indicated on plans per ab-017. tenant improvement under separate permit.
-
Jan 2018
New chese shop in existing commercial space. new counters, refrigerators, stainless sinks, new lighting and water heater. ste 165.
-
Jun 2018
14th floor: provide modification of the existing system. t.i. app#201803123385.
-
Aug 2022
13/f-phase 1&2: f/a t.i. phase 1: add 7 speaker strobes, 2 strobes, 6 smk det, 2 pull station/2contrlrelay; phase 2: add 1 booster power supply, 1 synch output mod, 24 speaker/strobes, 1 strobe, 1 smk det, 14 duck smk det, 14 control relay. ref bpa#202205124064.
-
Nov 2022
26/f: tenant improvement fire alarm system modification to existing elevator landing two-way emergency comm system.
DBI holds 92 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 92. 2 expired permits are not shown.
Nearby
- 112 1st Street Same street
- 118 1st Street Same street
- 110 1st Street Same block
- 100 First Plaza Same block
- 519 Mission Street Same block
- 22–525 Mission Street Same block
- 512 Mission Street Around the corner
- 415 Mission Street Around the corner