455–475 Market Street
East Cut · San Francisco, CA 94105
-
Apr 1981
New construction.
-
May 1982
New construction.
-
1988
Built to the pattern the 1985 Downtown Plan encouraged, with a firm street wall rising in recessed tiers.
-
Apr 1988
Mechanical, electrical, plumb, sprklrs, drywall, paint, ceiling.
-
Jun 2005
Remodel existing market st. arcade ( includes new lighting, benche & signage).
-
Mar 2006
Oti-1, 3rd floor el, me, ls, sp.
-
Sep 2011
Office ti on the 10th fl. build out new multi tenant corridor, 2 office tenant sopaces, remodel restrooms.
-
Jul 2013
Suite 2300: selective demolition construction of non-bearing partition, ceiling grid modifications, lighting, doors frames and hardware and finishes. commercial t.i.
-
Nov 2013
20th floor partial foor t.i. on multi tenant floor including demolition, new non-load bearing partitoins, ceiling.
-
Aug 2015
4th floor suite 400 - new construction to include interior office renovation of non-structural interior partitions, doors, ceilings, & finishes. mep, life safety & sprinklers as deferred submittal. n/a maher ord. 155-13.
-
Nov 2016
Selective demolition & construction of non-load bearing partitions, modifications to ceiling grid & tiles, new light fixtures & switching, new doors & frames, new millwork & plumbing & new finishes. maher na.
-
Apr 2018
Scope of work includes modification to an existing storage room. new bike storage and shower room. impromvents to include selective demolition and construction of non-load bearing partition & construction of new lighting fixtures, new doors, new plmg, showers, nw sinks, nw finishes. n/a for maher.
-
Aug 2018
3rd fl - ti on the 3rd fl to include meeting rooms and employee break area.
-
Jan 2019
7th floor: demolition of non structural wall/flooring, new construction consists of non-structural wall, new millwork, new ligh fixtures.
-
Jan 2019
8th floor: demolition of non structural wall/flooring. new construction consists of non structural wall, new millwork, new light fixtures, no structural work included.
-
Jan 2019
3/f: modification of e tenant improvment to include new demising wall, selective demolition and contruction of non load bearing partitons, millwork, new light fixtures and finishes on the third floor.
-
Jan 2019
2/f: modification of e tenant improvement to include new demising wall, selective demolition and construction of non load bearing partitons, millwork, new light fixtures, finishes on second floor.
-
Feb 2019
Structure drawing for movable partition in the conference room on 3rd fl.
-
Apr 2019
Suite 1650: partial tenant improvement incl demolition, partition, ceiling, finishes, electrical, mechanical & plumbing.
-
Dec 2019
23rd floor: full floor tenant improvement selective interior non-structural demolition & construction of partitions, doors, glazing, millwork, ceiling, lighting, electrical, mechanical, plumbing, & finishes. no change in occupancy, use or area.
-
Dec 2020
Ste #1900: modification of an existing tenant improvement. to include selective demolition & construction of non-load bearing partitions, new ceiling grid & tile, new light fixtures & switching, new doors, frames, millwork, sink & finishes.
-
Jan 2022
Suite 1460: tenant improvement: demolition & constructon of non-load bearing partitions, new lighting fixtures and compliant millwork and finishes.
-
Nov 2022
Suite #620: work includes: demolition and construction of non-load bearing partitions, modifications to existing ceiling grid & tile, new light fixture and swiching, new office doors and frames, salvage & reuse of existing selected materials, new millwork and sink, & new finishes. (mep deffered).
-
Apr 2024
17th/f, ste 1700: demolition & construct non load bearing partitions, new ceiling grids & tile. mew light fixtures, office doors & frames, millworks & sinks. new finishes. mep deferred.
-
Dec 2024
To replace existing obsolete networked siemens (mxl) voice f/a with new gen edwards est-4 voice f/a system as per calstate fire marshal information bulletin dates 9/1/2005 and code interpretations (12-001) dates 07/23/2012.
DBI holds 796 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 796. 9 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update