540–548 Market Street
East Cut · San Francisco, CA 94104
-
1976
The Bisexual Center, founded in 1976 as the first specifically bisexual organisation in the United States, operated from offices here, offering counselling and publishing the newsletter Bi Monthly from 1976 to 1984.
-
May 1984
Complete remodel walls floors ceiling, electrical plumbing.
-
Aug 1990
Store front repalce exterior painting & lighting.
-
Nov 1990
Build a restaurant with 595 sq ft.
-
Dec 1990
G/f new doors glass sidelights and transoms at main entries.
-
Jan 1991
Interior improvements to convert to retail candy sales.
-
Feb 2000
4 atms installation as shown on drawing.
-
Aug 2008
1st floor t.i. includes building out of a full height non-structural partitions. new restroom. hvac, electrical, plumbing on separate permit.
-
Feb 2014
Install new existing building maintenance equipment at roof level for new window washing appartus. complance with maher ordinance no 155-13 not req, no disturbance of at least 50 cu yd of soil.
-
Aug 2014
Replace existing hvac unit. n/a for the maher ordinance #155-13.
-
Aug 2014
Floors: 4th & 5th: removal of interior partitions & finishes, spare to remain unoccupied per ab-017. maher n/a.
-
Mar 2015
Interior t.i., new non structural partitions & finishes throughout 4/f & 5/f restroom & elevator lobby upgrades. n/a ordinance #155-13.
-
Jun 2015
5th floor: interior t.i. for a speculative suite. new conference, break, and finishes throughout. mep, fire, life safety sprinkler, and elevator upgrade under seperate permit. n/a for maher.
-
Jul 2015
Demolition only, no new construction. demolition of non-structural partitions, millwork and light fixtures. suite to remain unoccupied until tenant improvement permit is filed, under ab-17. n/a for the maher.
-
Sep 2015
Voluntary fire alarm control unit replacement: r&r - 1 fire alarm control unit, 1 remote led annumciator, 1; ed annunicator expander, 24 pull stations, 13 smoke det. n/a for maher.
-
Dec 2015
7th and 8th floor: interior t.i. for spec suite. new conference break and finishes throughout. 7th and 8th floor restroom and elevator lobby upgrades mep fire life safety and spinkler under separate permit.
-
Feb 2016
1st floor - demolition of non-bearing patitoins, stair & partial mezzanine floor, suite to remain unoccupied until a tenant improvement permit is filed - per ab-017. n/a maher ordinance.
-
Feb 2016
Demolition only 3rd floor, including removal of non structural partition, suspended ceilings, lights, millwork, plumbing and finishes. construction of ti, mep fire/life safety under separate permit. suite to remain unoccupied until a tenant improvement per ab-017.
-
Nov 2016
7/f: interior ti spec suite, 7th fl new partitions, electrical, pwr/comm and finishes. mep fire life safety and sprinklres under sep permit; maher ord 155-13 na.
-
Nov 2016
8/f: ti revision to pa 2015-1223-5867 - new layout, new tele/data, new undermount sink, new light fixtures, revised finish schedule/locations and reverse new door swings & new door type. mep fire life safety under separate permit.
-
Dec 2016
8th floor: complete revision to 201611293636 & 201512235867 ti- new conf rm, break, phone rms and lights/electrical & finishes. mep/fire/life safety under sep permit. (no work on 7th floor. under this permit; 7th floor. work under separate permit.) maher na.
-
Jan 2017
6th floor restroom interior improvement: new finishes, fixtures and accessories. mep, fire, life safty under seperate permit.
-
May 2017
Ground floor: remove existing non historical canopies & awnings at storefront. wash, clean and paint surfaces on exterior from grnd floor to 3rd floor. remove existing wells fargo atm and demising walls. new storefront @ atm. ele for future atm.
-
Apr 2019
To erect (2) non-electric, wall, projecting, double faced signs. (see's candies).
-
Sep 2020
Reroofing. must comply with cool roof requirements 2019 cec 141.0(b)2b.
DBI holds 75 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 75. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update