49 Stevenson Street
East Cut · San Francisco, CA 94105
Public art
- Escalieta I — Manuel Neri
Ordinario marble; 49 Stevenson entrance; open space and artwork is always accessible.
Installed 1985. Escalieta I is a marble sculpture by Manuel Neri (1930-2021), an American sculptor and a leading member of the Bay Area Figurative Movement's "second generation," installed at 49 Stevenson Street through San Francisco's 1% Public Art Program.
Permit history
-
May 1983
New construction.
-
Jul 1990
Cti-1.
-
May 1991
Cti 1 floor 13th.
-
Nov 2007
14th floor - building partition for office, conference room, library, server room. relocating lights as required, adding new power-data as required. new finishes. demolition under separate p/a 2007.11.19.8518. mep, life safety & sprinkler under separate permit.
-
Apr 2008
4th floor tenant improvement: office expansion from multi-tenant floor to single tenant floor; new ceiling height partitions with doors & sidelites/ upgrade restrooms on this floor. minor lighting layout and hvac modifications per new floor plan will be under separate permit.
-
Oct 2012
8th floor suite 800 - installation of partitions, doors, finishes, ceiling remodel. electrical, mechanical work under separate permit.
-
Mar 2013
3rd floor-office improvements including selective demolition of interior partitions, construction of new partitions, installation of new millwork & upgrades to existing ceilings. new finishes & furniture. f/a & sprinklers under seperate permit, mechanical, electrical & plumbing under seperate permit.
-
Aug 2013
13/f- interior remodel: installation of partitions, doors, ceiling and wall finishes. sprinkleers, fire alarm, mechanical & electrical under seperate permit.
-
Oct 2013
Minor interior remodel on 7th floor include installation of new partition, doors & finishes, minor demolition. electrical & mechanical under seperate permit.
-
Dec 2013
2nd floor: t.i. interior installation of new 1 hour partitions, doors, finishes, and ceilings. bathroom remodel to make comply. mechanical and electrical under separate permit.
-
Jun 2014
Tenant improvement: install new partitions, doors and finishes. mechanical & electrical under seperate permit.
-
Aug 2014
Install penn model z8-ra exhaust fan (hvac).
-
Apr 2017
Suite 1500: office t.i. partial demolition of partitions and ceilings, new plumbing fixtures, upgrade ada restroom. new partitions and finishes. new ceiling and lighting.
-
Dec 2017
4th - full floor installation of new partitions and gyp bd ceiling installation of new millwork, countertops and fixtures, new finishes throughout. paint and floor covereings. installation of card reader at elevator lobby and other locations. fire and mep will be design build under separate permits.
-
May 2018
Tenant improvement only architectural, full floor. partitions, restrooms, new ceilings, finishes. new casework, mep and fire under deferred permit(s). new rated elevator lobby doors, card readers.
-
Apr 2019
7th floor. suite 700: interior tenant improvement. new partitions, finsishes, paint, floor coverings, new single user ada restroom, install door operator & activation at ground floor entry to comply with acessible business entrance program. maher n/a.
-
Jun 2019
11th fl spec suite 1100: interior ti to include partial demolition of partitions & floor coverings, new partitions & finishes throughout, new unisex ada restroom.
-
Jun 2019
7th floor. electrical for permit application 201904117705. new break room, new power and data at offices and conference room. new lighting and controls. electrical only.
-
Jun 2019
7th floor. mechanical work for permit application 201904117705. demolition lowside duct work, piping and equipment. install new vav boxes and ductwork. add one fsd and dsd to rated penetration in the lobby.
-
Jul 2019
Ti- partial demolition of paritions & floor coverins, new finishes throughout and ada upgrade to restroom.
-
Aug 2019
New power data for conf rms & ofc. new break room., new lighting & controls ref 201906102948.
-
Oct 2019
Tenant improvement of existing basement restrooms, corridor, stairway & ground floor dining & take-out areas. no work to existing egress components. new interior non-structural partitions & associated finishes, lighting, mechanical, electrical, & plumbing.
-
Oct 2019
Tenant improvement of existing basement kitchen space. no work to ground floor dining or ground floor kitchen areas. no work to existing egress components. new interior non-structural partitions & associated finishes, and lighting, mep associated with all kitchen equipment. addition of employee use restroom.
-
Feb 2020
Suite 300: tenant improvement, demolition partitions, ceiling, floor coverings and install new. add new single user ada restroom.
DBI holds 275 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 275.
Not yet documented: the developer, the early tenants and who designed the open space. Submit an update