71 Stevenson Street
East Cut · San Francisco, CA 94105
-
Feb 1982
New construction.
-
1986
Built to the pattern the 1985 Downtown Plan encouraged, with a firm street wall rising in recessed tiers.
-
Mar 2003
Fire life safety system replacement for existing highrise.
-
Apr 2007
Oti-1, 17th floor, el, ls, sp.
-
Oct 2007
T/i 9th floor-full floor remodel to provide new offices, conference room, open office space.
-
Feb 2008
Office tenant improvement on 3rd floor includes new offices, break rooms, conference rooms. mep, life safety, fire sprinkler under sepatare permit.
-
Feb 2008
Office tenant improvement on 2nd floor. work includes new offices, break araes, conference rooms. mep, fire sprinkler and life safety under separate permit.
-
May 2008
Suite 600: demolition of non bearing partitions, new partitions, electrical, plumbing, relocation of existing light fixtures, new finishes. mep & sprink under separate permit.
-
May 2008
Suite 700: demolition of non-bearing partitions, new partitions, electrical, plumbing, relocation of existing light fixtures, finishes. m.e.p. & sprinkler under separate permit.
-
May 2013
7th fl: dimising an existing commercial b-office space into multiple suites. suite 700: demolition and construction of non load bearing partitions, new or reconfiguration of existing ceiling grid and tile, relocation of new light fixtures, new outlets, and new finishes suite 725 limitted to the construction.
-
Aug 2013
T.i. on 12th floor to do selective demolition and construct new non-olad bearing partitions, doors and finishes with mep. life safety and sprinklers.
-
Feb 2015
20th fl: t.i. includes construction of non-load bearing partitions, new millwork etc. mechanical & electrical included. fire sprinklers and life safety work under seperate permit.
-
Feb 2015
T.i. includes construction of non-load bearing partitions, new millwork etc. mechanical & electrical included. fire sprinklers and life safety work under seperate permit.
-
Jul 2015
13th fl: interior t.i of existing office space including new non-structural partitions, minimal changes to light fixtures. meps to be design build and filed under sep permit.
-
Jul 2015
9th fl: interior t.i of existing office space including new non-structural partitions, minimal changes to light fixtures. meps to be design build and filed under sep permit.
-
Aug 2017
10th fl - interior ti of existing office space; minimal new non structural partitions. mep's, life safety & sprinkler permits under separate permit submittal if needed.
-
May 2019
19th fl: demolition of non-structural partitions, ceiling and lighting, finishes and power on 19th fl. new non-structural partitions, ceilings, lighting, millwork, power and finishes.
-
May 2019
20th fl: demolition of non-structural partitions, ceiling and lighting, finishes and power on 20th fl. new non-structural partitions, ceilings, lighting, millwork, power and finishes.
-
Jul 2019
6th & 7th floor - installation of: new partitions & gyp board ceiling, millwork, countertops 7 fixutres, light fixtures. new finishes throughout, paint and floor covering.
-
Sep 2019
R&r hvac systems on the 6th & 7th floors.
-
Dec 2019
5th floor: t.i. of office suite spaces. install new partitions and gyp bd ceiling. install new millwork, countertops and fixtures. new finishes and installtion of light fixtures.
-
Jan 2024
Interior tenant improvement: demolition of non structural partitions, millwork, finnishes. new partitions, finishes and reolcated lighting. mep, fire and life safety under sep permit.
-
Jun 2024
Floors 22 &23- interior tenant improvement, selective demolition and construction of non structural partitions. minor reworking of e ceilings and light fixtures, new millwork, finishes, mep deferred.
-
Oct 2024
10th floor. interior t.i. to 10th floor. to include walls, ceilings and finishes.
-
Jul 2026
9th floor, suite 900: interior tenant improvement & demolition and new non-structural partitions, new muti-tenant corridor, new finishes, fixtures, and relocated lighting. mep, fire life safety under separate permit.
DBI holds 505 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 505.
Not yet documented: the developer, the early tenants and who designed the open space. The assessor records 1986; a secondary source (CommercialCafe, citing the Skyscraper Center) states construction ran 1985 to 1987. Submit an update