381–383 Bush Street
Financial District · San Francisco, CA 94108
-
1918
The African American attorneys Oscar Hudson and McCants Stewart shared law offices in the Alto Building here in 1918.
-
Jan 1985
To install (fire) sprinklers in offices addition to exist.
-
Aug 1988
Structural sidewalk replacement.
-
Oct 1994
Light demolition of interior space remove existing restroom flrng.
-
Nov 1994
Interior tenant improvements.
-
Jan 1995
Reduction in tenant improvements, refer to appl #9418197.
-
Jan 1995
Erect 3 electric signs.
-
May 1998
Provide access to the 2nd fl exit for the 4th fl, 5th fl, fir.
-
Aug 1999
Remodel coffee shop.
-
Mar 2000
Renewal of application 9916007.
-
Dec 2000
Replace existingespresso machines, minor counter adjustments, mechanical under sep permit.
-
Apr 2002
Fire sprinkler work only.replace main with new pipe.modify location to protect tenant space at bsemt.
-
Jul 2004
Reroofing.
-
Apr 2005
Demolition or remove some item shown in the plan, relocate case work, relocate plumbing, relocate.
-
Jan 2006
Replace countertop and under counter cabinet and install new. 1 new refrigerator and microwave with 2 new dedicated outlets.
-
Jul 2010
Interior ti to starbucks. demolition vinyl walls, patch and finish with smooth paint. demolition casework and countertops. new countertops with new casework and relocated casework. demolition door and replace. demolition interior door and replace. demolition existing floor and refloor. no lighting, mechanical, fire.
-
Apr 2016
Starbucks: exterior install newreserve graphics @ window. interior: remove existing&install newdoors.removeexistingfurniture & fixtures & providenew.removeexisting&installnewlights.removeexistingwall & floor finishes provde new.providenewhandsink @workroom, replaceexistingmop, sink &existingwater heater, update existingrestrm finishes.
-
Aug 2019
Provide and install new nitrogen infused coffee dispenser//nitrogen used in this project is 18 gallons, 6 kegs of 3 gallon each, it does not meet the criteria for operational permit per cfc table 105.6.11.
-
Oct 2020
Alteration of subsidewalk basement roof slab to install new accessible curb ramp.
-
Feb 2022
Like for like fire alarm installation with sprinkler monitoring system. install facu. smoke detectors, pull stations, new aes, monitor module.
-
Nov 2024
Install raceway with electrical with 17 channel letters for "haraz coffee house" facing street for "sign b". share plans with 2024-1115-5119. for "haraz coffee house" business.
-
Nov 2024
Install raceway with electrical with 17 channel letters for "haraz coffee house " facing street for "sign a". ref to 2024-1115-5120. for "haraz coffee house".
-
Mar 2026
Install (2) identical raceway with illuminated 17 channel letters signs: "haraz coffee house" facing street.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update