222–226 Kearny Street
Union Square · San Francisco, CA 94108
-
1907
The Robins Building was built to the design of T. Paterson Ross — four storeys of brick with an unglazed terra cotta surface, a two-part vertical composition with large three-part Chicago-style windows and stylised Corinthian colonnettes on the upper levels. It stood here until the 222 Kearny Street office tower took its place in the mid-1980s.
-
1908
The Robins Building was remodelled and enlarged, a year after it was built. It stood in that form until the 222 Kearny Street tower took its place in the mid-1980s.
-
1979
The Robins Building stood here until the 222 Kearny Street office tower took its place in the mid-1980s. the Foundation for San Francisco's Architectural Heritage rated the Robins Building "C" in the 1979 downtown survey it published as Splendid Survivors — the third of its four grades, for buildings that count for their scale and materials and for the way they hold a streetfront together. The Department of City Planning's 1976 Architectural Inventory coded it 0-F1-0.
-
Apr 1982
Additions alterations or repairs.
-
Aug 1982
Alteration and renovation of existing building.
-
1987
Built.
-
Feb 1987
Drywall, mechanical., electrical., life safety, finishes, sprinklers.
-
Jun 1987
Drywall, mechanical, electrical, plumb, life safety sprinklers, finishes.
-
May 1988
Structural steel, drywall, mechanical, electrical, plumb, life safety.
-
Aug 1988
Drywall, mechy, electrical, plumb'g, sprklrs, finishes @ 5th fl.
-
Nov 1993
Cti-1 (el me sp).
-
Apr 2004
Remove selected exist finished in grd fl retail space.t.i. under sep permit.interior non-structural.
-
Sep 2004
Oti-1, 2nd floor, el, me, ls, sp.
-
Sep 2007
Office t.i. demolition offices and demising walls for new 4 offices, new conf. room and new demising wall. no mechanical. or electrical. under this permit. no exterior work. 4th floor only.
-
Oct 2008
Reroofing.
-
Sep 2011
2nd & 4th floor: demolition of non-structural partitions, construction of new non-structural partitions & glazing. new acoustical ceiling grid & lighting. electrical & mechanical & life safety & fire sprinklers to be design build under separate permit.
-
Jan 2012
Ti. 2nd & 4th floors - hvac modification for new walls life safety under sep permit. ref permit application 201109013699.
-
Jun 2014
Minor demolition, patch and repair on 2nd floor. minor demolition, new partition on existing 4th floor suite. build out of new tennant suite on 4th floor. mep and fire safety under separate permit.
-
Mar 2016
Replace existing cooling tower with new (like for like) same location and weight.
-
May 2016
10th floor: ti & demolition, 2 new offices, millwork & finishes, mep/fire/life safety under sep permit. no structural work performed.
-
Aug 2016
Suite 304 - project consists of demolition & providing new partitions, doors, glazing, millwork, power & tele/data receptacles, finishes throughout along with ceiling grid & tile, light fixture, mechanical, electrical, life safety & sprinklers system modification unde sep permit.
-
Nov 2016
2nd & 4th floors: interior ponly ti - non structural demolition & construction of partitions. new carpet & paint. some new light fixtures. scope has been reduced to break rooms, conference rooms, and restrooms.
-
May 2017
6th floor, suite #650 -project consists of t.i. including demolition non-structural partitions, doors, glazing, millwork, power & tele/data receptacles, & finishes thru-out along with ceiling grid/tile, & light fixtures with other assoc ceiling items. me, el, life safety, sprinkler sys under separate permit.
-
Apr 2018
Minor partition demolition, new partitions and sidelites, new casework & power/data. new finishes througout, no lighting work. any modifications to sprinkler, fire liffe safety systems under separate permit.
-
May 2018
Ste 600: partial ti including demolishing non-structural partitions, doors, glazing, millwork, power & tele/data receptacles, and finishes, ceiling grid/tile, and light fixtures with other associated ceiling items. mep, fire under separate permits.
-
Sep 2018
Interior ti of 7th & 9th floors only. non-structural demolition & renovation to include but not limited to partitions, flooring, ceilings, furnishings & finishes. no other work under this pa. mep, life safety, sprinklers under sep permit.
-
Jan 2019
Ref permit application 201809119708; mechanical & electrical. 7th and 9th floor, provide 6new vav boxes, with reheat coils. (5) new fan coils @ 7th and 9th floor. (1) new air cooled unit on roof.
-
Jun 2021
#450: interior demolition of non-structural elements including but not necessary limited to int. partitions, doors, finishes, ceiling grid and tile, lighting, mechanical and electrical outlets & switches. mechanical and electrical will be submitted as seperate permits.
-
Apr 2026
Modification of e tenant floor plan layout to include additional lobby vestibule off of main elevator lobby to access existing roof deck and relocation of point of entry to the following rooms: 1df, storage room and wellness room.
DBI holds 251 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 251. 1 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 219–225 Kearny Street Same street
- 227–231 Kearny Street Same street
- 200–220 Kearny Street Same block
- 240–244 Kearny Street Same block
- 154–180 Sutter Street Same block
- 246–250 Kearny Street Same block
- 165 Sutter Street Around the corner
- 209–211 Sutter Street Around the corner