Permit history
-
Nov 1984
Revisons to approved addendum #1 'seismic upgrade".
-
Jul 1988
Drywall, mechanical, electrical, plumb, sprklrs, finishes @ 3rd floor.
-
Nov 1989
Interior build out for hair salon.
-
Mar 1993
Cti-1 4th floor el, me, sp.
-
Sep 2000
Seismic upgrade-accessibility upgrade, life safety upgrade.
-
Feb 2001
Retail tenant improvement to retail space on 1st floor & basement, new stair rstrm, ceil, fix.
-
Aug 2001
Lifesafty system-furnish and install new bse bldgn fire alarm system-this will include smoke detecto.
-
Oct 2002
Oti-1 2nd floor electrical, mechanical, lifesafty, sprinkler.
-
Nov 2002
Oti-2 2nd floor el me.
-
Jul 2005
Interior fit out of an existing space for a shoe store. all walls, storefront and restroom are existing.
-
May 2006
Oti-1 g/f el, me, ls, sp construct partial height walls for t.i.
-
Apr 2012
Demolish exist sidewalk, water proof membrane & partial structural frame, install new steel structure metal deck, concrete waterproof membrane topping, slab, curb & gutter, restore finishes, mep in basement.
-
Sep 2012
3rd floor-demolition existing floor finishes only and conwsturction of new soors/frames, partitions power and finishes light fixture relocataion only. mechanical, electrical, life safety, and sprinkler modifications are permited separate.
-
Sep 2012
5th floor-demolition floor finishes, consruction of new door and frames, partitions, power and finishes, light fixtures, relocation only.ele, mechanical, life safety and sprinkler. modifications permitted separate.
-
Nov 2012
Remove previous tenant walls and provide new walls for new tenant at ground floor.
-
Jan 2015
Interior tenant improvement for new cafe located on gorund floor of existing building in existing restaurant space.
-
Aug 2016
Ground floor- project consists of demolition of existing interconnecting staircase between ground & basement, demolition of surrounding walls & infilling stair opening, minor demolition of select partitions on ground floor. space is correctly unoccupied. plumbing, life safety, sprinkler sys modification under separate p.
-
Aug 2016
Ground floor: ti- new tenant. work includes new partitions, fixtures, finishes, new bathrooms, pantry, mep. no exterior work, fire protection under sep permit.
-
Oct 2016
1st floor fire sprinkler permit - relocate 10, add 23 & delete 25 pendents. add 2 sidewall sprinklers. repipe approximately 45'of fdc pipe. ref permit application 201608155010.
-
May 2017
4th floor t.i. includ non-struct partitions, doors, glazing, millwork, power & tele/data receptacles & finishes thru-out, along with ceiling grid/tile, & light fixtures with other assoc. items. demolition of existing lights in restrm & existing ceiling, lights thru-out. mechanical, electrical, life safety sprinkler sys under sep ermit.
-
May 2017
Basement - consists of a new basement level storage space demising wall (non-structural) to convert single storage area to two separate storage areas. upgrade existing single occupant basement restroom to ada compliant single occupant restroom. plumbing, life safety & sprinkler sys under sep permit.
-
Oct 2017
Project consist of - and limited to millwork, finish, furniture & lighting upgrades to existing lobby. mechanical, electrical, life safety and sprinkler system modification are under seperate/deferred permits. ground fl lobby.
-
Mar 2018
4th fl - ti new non structural partitions, doors, glazing, millwork, power & tele/data receptacles finishes throughout. mep & life safety under separate permits. demolition of it room, lights in restrooms & ceiling & lights throughout suite.
-
May 2018
Suite 400 - mechanical - 1 new vav reheat unit, hws&r, new duct. electrical - new lighting & branch circuiting. ref pa 2018-0309-3335.