586–598 Bush Street
Financial District · San Francisco, CA 94108
Permit history
-
Dec 1981
Additions alterations or repairs.
-
Apr 1983
Maintenance & repairs of existing bathrooms.
-
Nov 1984
Install new ceramic tile fl./5 handicap access in bath.
-
Jul 1985
Install a fire sprinkler system for entire building.
-
Jul 1985
Remodel existing restaurant spare to previde new suspended.
-
Jan 1998
Provide path to toilert room to existing restaurant.
-
Aug 1998
Install four canopys at 590 bush st.
-
Aug 1999
Relocate one and add four fire sprinklers.
-
Dec 2000
Seismic upgrade/strengthening upper 6 stories are retrofitted by bolts plusprocedure.
-
Mar 2001
Emergency replacement fire alarm sys phase 1 replace ex devises 2/3 bring sys into compliance.
-
Jun 2004
Floor 2-9: new roof, minor interior alterions-new closets/doors, interior work.
-
Jul 2004
Partial remodel 1/f interior, fire alarm, sprinklers, mechanical.on sep. permit, work on g/f only.
-
Jul 2004
Replace wxistiing windows with same, install air aconditioners, repair blade sign, nrmove modern *.
-
Sep 2004
Electrical of hvac remodel 1st floor.
-
Sep 2004
Modification of fire alarm systm as required under permit #1031332 partial first floor remodel.
-
Oct 2004
Renovate part of 1st floor for hotel/timeshare offices, remodel basement unisex bathroom. sprinkler &.
-
Dec 2004
Expanding existing fire alarm system due to a partial floor remodel of the 1st floor.
-
Dec 2004
Replace one existing hvac system; install one new hvac system. revision to permit application 200410136608.
-
Sep 2010
Replacement of existing windows in existing spaces, wood windows as per westeck plans, revision 2 sept 15, 2010, all windows replaced in building, 2nd floor and up to roof level, about 268 windows.
-
Oct 2013
Emergency repair to existing lobby ceiling due to water damage. replace existing gyp board ceiling & light fixtures. 5/8" type x gyp board. scope of work is not for a rated assembly.
-
Mar 2014
Fire sprinkler relocate 13, new 7. t.i. app#201311131731. n/a for the maher ordinance #155-13.
-
Sep 2014
2nd floor: ada/t-24 upgrades in 5 existing units, replace and reposition vanity sinks, roll-in showers, non-compliant tubs, cabinetry, and furniture, electrical & plumbing on separate permits, barrier removal. note: no fire sprinklers or life-safety; maher n/a. barrier removal.
-
Aug 2020
Remodel 88 existing rooms (108 baths): removing 1 piece shower, replace shower valves, install new shower pan, install densshield (or equiv) at shower walls, install new tile around shower walls, r/r tile on bath floors, r/r toilet, r/r vanity light fixtures. all work in-kind.
-
Sep 2020
Upgrdes to 5 existing guestrooms and common areas for accessibility compliance. no proposed changes in use, occupancy or building area.
-
Jun 2021
Relocate & add fire sprinkler per new ti drawings 2nd fl, one unit, relocate 1 sprinkler, 4th fl, one unit, relocate 3 sprinklers, 5th fl, one unit, relocate 3 sprinklers, 6th fl, one unit, relocate 2 sprinklers & add 1 sprinkler, 8th fl, one unit, relocate 3 sprinklers. ref permit 2020-0819-2113.
DBI holds 53 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 53. 6 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update