37.7697, −122.4290 A locator map appears here once a Mapbox token is configured.

1–45 Church Street

Hayes Valley · San Francisco, CA 94114

  • 96-unit apartment building
  • 4 stories
  • Zoned NC-3
  • District 8
  • Historic status: not a historical resource
37.7697, −122.4290 Street View appears here once a Google Maps embed key is configured.
100,997 sq ftBuilding area
44,331 sq ftLot area
96Residential units
  1. 1953

    Landscape design for the Daphne Funeral Home by landscape architect Geraldine Knight Scott.

    Architecture, Planning & Preservation Professionals: A Collection of Biographies, adopted 2021
  2. 1954

    Daphne's San Francisco Funeral Home, designed by the Los Angeles firm Jones & Emmons. Since demolished.

    Architecture, Planning & Preservation Professionals: A Collection of Biographies, adopted 2021
  3. 1954

    Daphne's San Francisco Funeral Home, 1954, by Jones & Emmons with a landscape by Thomas D. Church — one of the finest non-residential Second Bay Tradition buildings in the city, replaced by a housing complex in the 1990s.

    Modern Architecture and Landscape Design Context Statement, adopted 2011
  4. 1954

    The Daphne Funeral Home, since demolished, was designed and built between 1950 and 1954: a two-storey cantilevered mortuary of simple geometric volumes on a roughly cruciform plan, linked by a canopy to a single-storey chapel whose roof was made of planes set at different heights under broad overhangs, with ramps for circulation and fixed, ribbon and plate glass throughout. The commission first went to Frank Lloyd Wright; his contract was ended and the work passed to A. Quincy Jones, the only mortuary Jones built. Geraldine Knight Scott laid out the grounds with native and exotic planting and Japanese-influenced features — small stone shrines, private garden spaces, a rock garden — keeping the rock outcrop at the southern edge.

    San Francisco Planning Department, Church Street Apartments: Draft Environmental Impact Report, Case No. 99.097E, 1999.
  5. 1967

    A fire destroyed more than half the administration building of the funeral home that then stood here, taking most of the windows and the neon sign. Owen Jones drew the rebuilding, overseen by A. Quincy Jones: the smooth redwood siding gave way to redwood plywood battened with rough-sawn two-by-twos, the ribbon windows on the south side went, the neon was never replaced, redwood walls inside became plasterboard, damaged terrazzo was patched with concrete and the roof overhang was cut back. Plans for a second chapel and a greenhouse were abandoned.

    San Francisco Planning Department, Church Street Apartments: Draft Environmental Impact Report, Case No. 99.097E, 1999.
  6. Nov 1981

    Additions alterations or repairs.

    Complete Permit 8110064 $$$ $100
  7. Dec 1985

    Grading & paving of existing dirt lot.

    Complete Permit 8513801 $$$ $7,000
  8. Jan 1993

    Install backflow prevention device on exist.sp riser in bsmt.

    Expired Permit 9301372 $$$ $5,375
  9. Dec 1999

    Erect a one story podium building.

    Complete Permit 9926694S $$$ $3,700,000
  10. Jul 2000

    To erect a 4-story 64 unit apartment/retail building.

    Complete Permit 200007276238 $$$ $4,400,000
  11. Jul 2000

    Erect a three story thirty unit residential building/church/childcare.

    Complete Permit 200007276239 $$$ $2,900,000
  12. Aug 2000

    Install temp. soil nail wall/ shoring.

    Complete Permit 200008157925 $$$ $50,000
  13. Mar 2001

    Install new fire sprinkler heads with new system. include new fire services.-underground.

    Complete Permit 200103144227 $$$ $250,000
  14. Oct 2001

    New fire alarm system.

    Complete Permit 200110181156 $$$ $25,000
  15. 2002

    Built.

  16. Mar 2002

    T/1 for cchild care with new walls, plumbing, electrical., mechanical and finishes.

    Complete Permit 200203151549 $$$ $275,000
  17. Jul 2002

    New coffee shop 1 counter new kitchen equipment.

    Expired Permit 200207050718 $$$ $15,000
  18. Apr 2011

    Repair in kind approx. 220 sq ft. of stucco at 2 locations to verify waterproofing. install scaffold to facilitate access. scaffold to include pedestrian caopy. no structural work, visable from street, in kind only.

    Complete Permit 201104073660 $$$ $10,000
  19. Jun 2012

    Major street encroachment for a new infant play yard, sitting arear, trellised entry, stroller parking at existing ground floor child care center.

    Withdrawn Permit 201206223229 $$$ $105,400
  20. Dec 2014

    Major street encroachment for a new infant play yard, sitting area, trellised entry and stroller parking at exsiting ground floor child care center. maher n/a.

    Complete Permit 201412043040 $$$ $93,340
  21. Oct 2016

    #317: replace one in kind living room window. #217: replace one bedroom window from single hung to slider clear opening w: 21 3/16" h: 56" all finishes to be in kind.

    Issued Permit 201610130239 $$$ $10,712
  22. Feb 2017

    Replace all windows (except 1 in two units in one unit), r&r stucco, waterproof all decks. all windows and sliders are vinyl in kind. like for like.

    Issued Permit 201702240118 $$$ $3,200,000
  23. Jun 2018

    To comply with nov # 201864931, item 5, line walls and back side of door with 26 ga galvanized sheet metal in 4 ea garbage rooms (1st, 2nd, 3rd & 4th floor garbage rooms) n/a maher.

    Complete Permit 201806212546 $$$ $15,000
  24. Jun 2018

    Ref permit application 201702240118; added scope of work to courtyards, sliding glass door replacements, deck coating, exterior, siding stucco, interior cosmetic repairs.

    Complete Permit 201806222691 $$$ $11,000,000
  25. Oct 2018

    Mep's for permit application 201806222691.

    Issued Permit 201810102723 $$$ $2,000,000
  26. Oct 2018

    Accessibility unit upgrades. add scope to permit 201806222691. maher n/a.

    Cancelled Permit 201810102721 $$$ $1,800,000
  27. Nov 2018

    Upgrade the fire alarm system per city ord, add low frequency sounders for all rms. smoke detectors in all communication units. old booster power suppliers will be removed & replaced with new like-kind. existing notication appliances to be removed & replaced with like kind appliances.**maher n/a**.

    Complete Permit 201811216523 $$$ $13,708
  28. Dec 2018

    Addition of scope to permit #201806222691. plywood replacement from p.t to structural plywood. all other structural work to be in-kind. new struct work per sheets s-1.01 thru s-4.10. n/a for maher.

    Issued Permit 201812047372 $$$ $300,000
  29. Feb 2019

    Priority plan review. add scope to permit #201806222691. accessibility unit upgrades.

    Complete Permit 201902153108 $$$ $1,800,000
  30. Jan 2020

    Site improvement to main entry. site improvements include re-design of existing steps, ramp, pavement.

    Complete Permit 202001162128 $$$ $100,000
  31. Mar 2020

    Remove existing upper vehicle gate. furnish & install new upper vehicle gate. remove existing lower vehicle gate. furnish and install 2 swing gates & operators. to comply with complaint 201864931 items 4 & 8.

    Complete Permit 202003137047 $$$ $42,000

DBI holds 54 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 54. 8 of them are nominal $1 street-space or sidewalk permits. A citywide context statement records work at this address dated 1954; the assessor's roll dates the structure on this parcel to 2002. Whether the building described still stands here is unsettled. The landscape here is credited to Thomas D. Church by the city's Modern architecture statement and to Geraldine Knight Scott by the citywide collection of professional biographies.

Nearby