50 Church Street
Hayes Valley · San Francisco, CA 94114
-
1906
The Duboce Apartments, a 72-unit four-storey frame building put up immediately before the earthquake and cited as the type example of the larger apartment buildings that replaced Duboce Triangle's single-family houses.
-
Oct 2003
Replace main entrance door in compliance with nov#200344049 in kind replacment.
-
Dec 2011
One unit: kitchen and bath remodel, relocate kitchen and remove non-bearing walls.
-
Aug 2014
One unit: markoff structural wood destroying organismm report #145356, item 1.
-
Apr 2016
Reroofing.
-
Jun 2016
Soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. add new wood shear walls at basement, add holdowns at ends of shear walls & anchor bolts to existing foundation.
-
Jun 2017
Remodel bathroom in one unit to correct nov #201767542, items #2, 3, 4, &6. no alteration of wall, window and door.
-
Sep 2018
#118- rehabilitate existing kitchen and bathroom install with d.
-
Dec 2018
Rehabilitate existing kitchn & bath. install with d. convert existing kitchen to bedroom.
-
Mar 2019
Two units)convert existing kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate existing bathroom. 4)install washer and dryer.
-
Apr 2019
One unit: rehabilitate kitchen and bathroom.
-
Jun 2019
#403: rehabilitate existing kitchen & bathroom. install washer & dryer.
-
Oct 2019
One unit - 3rd floor - remodel kitchen, bath, structural work in kitchen. partial demolition of e load-bearing wall in kitchen. ref#201909030483.
-
Oct 2019
One unit: rehabilitate existing kitchen (open wall between kitchen/living room; add new header) & bathroom; install washer and dryer. all per plans.
-
Dec 2019
One unit: remodel kitchen & bathroom. install washer/dryer ventless unit. no walls movied, altered, no structural work.
-
Jul 2020
One unit- rehab kitchen. upgrade washer/dryer.
-
Aug 2020
One unit. rehab bathroom & kiatchen. replace washer, dryer. no structual work. no moving walls.
-
Nov 2020
One unit - rehab bathroom & kitchen, replace washer/dryer.
-
Nov 2020
One unit: rehab bathroom and rehab kitchen. replace washer and dryer.
-
Oct 2021
One unit: remodel kitchen and bathroom. no structure work. no moving walls.
-
Dec 2021
One unit: rehabilitate existing bathroom. rehabilitate existing kitchen. install washer and dryer.
-
Apr 2022
One unit. rehab existing kitchen and existing bathroom. no structural work. no moving wall.
-
May 2022
One unit: rehab existing kitchen & bath. install washer & dryer.
-
Nov 2022
One unit- remodeling existing kitchen. no moving walls, no exterior work.
-
Jul 2024
Upgrade fire alarm system to current codes, nfpa 72 (2022). to comply with sffc sec. 1103.7.6.1 to provide low frequency sounders in sleeping areas.
-
Oct 2024
One unit- kitchen and bathroom remodel new cabinets, replace fixtures, no exterior work, no interior wall moved. no new wall framing. provide 100 sq in opening for makeup air. terminate exhaust 3' from pl and opening. new washer/dryer.
DBI holds 64 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 64. 9 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. The Market & Octavia context statement describes a building of 1906 at this address; the assessor dates the building on this parcel to 1905. Submit an update