Sacred Heart Rectory
546–548 Fillmore Street · Hayes Valley
-
1887
Thomas J. Welsh's first Sacred Heart Church, a two-storey wood-frame Romanesque building for 700 people with the sanctuary upstairs and a Sunday school of eight classrooms below, was built on this site; it was moved to the back of the lot in 1889 to clear the ground for the brick church, and served as the parish school once that was finished.
-
1891
The rectory was built around 1891 as a two-storey wood-frame house faced in brick on the front, designed and built by the contractor Hugh Keenan, for the four to six priests of the parish.
-
1893
The pastor put up a makeshift twelve-room house for the Dominican Sisters, who had just come to teach the parish school, on the parish property behind the rectory.
-
1898
Sacred Heart Church, designed by architect Thomas J. Welsh, principal architect to the Catholic Archdiocese of San Francisco.
-
October 1906
A fire months after the earthquake seriously damaged the rectory, and Welsh & Carey rebuilt and enlarged it over the following year, adding the third storey and new brick facing: forty rooms, with two meeting halls in the basement seating about 250.
-
1907
Built by Hugh Keenan.
-
1915
A wood-frame bridge was built from the rectory's third storey to the choir loft of the church next door, letting the priests reach the sanctuary for early mass under cover.
-
1917
The rectory's interior was renovated and rearranged.
-
1924
At some point between 1924 and 1954 the front entrance was recessed and given a stucco surround, the transom above it removed or covered, and the hood over the second-storey three-part window taken off.
-
1950
Some time after 1950 a garage door was cut into the south end of the basement storey on the street front, and the main entrance's door and sidelights were replaced.
-
1968
Father Eugene Boyle, pastor until 1972, held the meetings of his St. Patrick's College seminar on social concerns in the rectory; the seminar's first class had written 'San Francisco: A City in Crisis', the 600-page race-relations study known as the 'Little Kerner Report'.
-
Nov 1986
Sprinkle ground floor of rectory.
-
1989
The large basement hall was remodelled in stages, through the late 1990s, for a tenant's child-care centre.
-
Aug 1997
Installation of fire control panals smoke detector.
-
2011
The rectory was seismically upgraded and its entry lobby rehabilitated.
-
Feb 2011
Voluntary partial seismic strengthening & foundation upgrades include removal & replacement of sheetrock, pipes, wiring, doors & windows and other appurtenances at 1st floor. repair as require damaged tile cabinets & fixtures. no exterior work. field verify sprinkler/fa coverage.
-
May 2011
Voluntary seismic upgrade, revision 2011-02-09-9946, reduce scope of work at foundation. revise shearwall locations per plan.
-
Jul 2011
Reinstall existing fire alarm system devices removed for seismic upgrade app#201102099946. fire alarm system as builts to app#9716367 for main 2nd level and 3rd floor. relocate existing devices, install 9 smoke detectors, 9 horn/strobes, 1 strobe, 1 horn, 1 sync mod for lower (1st) level.
-
2012
The rectory was sold, with the convent on Oak Street, by the academy that had owned the parish buildings since 2005.
-
September 28, 2017
Listed on the National Register of Historic Places as part of the Sacred Heart Parish Complex, with the church, rectory, school and convent around it.
-
2024
Designated San Francisco Landmark No. 316, Sacred Heart Parish Complex.
-
2024
The rectory was found to contribute to the Hayes Valley Residential Historic District, determined eligible for the National Register of Historic Places through Section 106 consultation.
-
Oct 2025
2nd floor: remodel three bathrooms. 2 @ 6'6 x 6'1, 1 @ 9'x 10' 4'2.
-
Nov 2025
Reroofing: remove the existing roofing down to the sheathing board and the surface will be cleaned, install one ply of app base membrane and install a second ply of certainteed gts modified bituman membrane, we ill replace all the roof flashings and vents (hot works).
6 expired or cancelled permits are omitted. The 1898 entry for Sacred Heart Church describes the church next door at 554 Fillmore Street; this parcel carries the rectory. The rectory is credited both to the contractor Hugh Keenan (as built about 1891) and to Thomas J. Welsh. The connector is dated both to about 1915 and to some time between 1913 and 1920.
Nearby
- 330 Fillmore Street Same street
- Sacred Heart Church Same street
- Sacred Heart Convent Same block
- Sacred Heart School Same block
- 731–733 Fell Street Same block
- 437–441 Webster Street Same block
- 829 Fell Street Around the corner
- 754–758 Fell Street Around the corner